Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 9.99¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced1.9 GW
- Interconnection requests—
- Contracted / approved—
- Under construction1.9 GW
- Operational512 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (MISO, PJM, SPP). Requests are applications, not commitments — most never get built.
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Council Bluffs / Omaha | 19 | 284 MW | — | |
| Des Moines | 39 | 228 MW | — |
Largest operators & owners
Online + pipeline MW at linked facilities
Largest customers & end users
Tenants and workload owners, where sourced
None identified.
Utility exposure
Most likely retail utility by location (approximate)
- Alliant Energy0 MW + 1.59 GW · 1 sites
- MidAmerican Energy512 MW + 314 MW · 61 sites
Grid operators (ISO / RTO)
By facility location
- MISO512 MW + 1.9 GW · 62 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| QTS Cedar Rapids | Under construction | — | 1.59 GW |
| Google Cedar Rapids | Under construction | — | 314 MW |
| Google Council Bluffs (East) | Operating | 284 MW | — |
| Microsoft Project Osmium | Operating | 228 MW | — |
Facilities by status
- Operating60
- Under construction2