GlobeNet Tuckerton Cable Landing Station
Also known as GlobeNet Tuckerton CLS
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityGlobeNet Tuckerton Cable Landing Station
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityAtlantic City Electric CO[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 39.60987, -74.32614
- Address
- County
- Ocean County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
New Jersey statewide average, July 2026.
- State avg. commercial price
New Jersey statewide average, July 2026.
- Generation within 50 km
28 EIA-reported plants within 50 km.
- Generation queued in county
12 active generation interconnection requests in Ocean County: Offshore wind 2,959 MW, Storage 270 MW, Solar 99 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Forked River · Forked River Power, LLC | Power plant (Natural Gas) | 24.9 km | 65 MW | [6] |
| Jersey-Atlantic Wind Farm · Leeward Asset Management, LLC | Power plant (Wind) | 27.4 km | 8 MW | [6] |
| Delilah Road Landfill · CVI CleanCapital Solar 5 LLC | Power plant (Solar) | 28.5 km | 9 MW | [6] |
| Bayville Central Facility · Ocean County Utilities Auth | Power plant (Petroleum) | 35.6 km | 7 MW | [6] |
| Edf Ph1 Toms River · MN8 Energy LLC | Power plant (Solar) | 42.3 km | 21 MW | [6] |
| Lakehurst Solar · Consolidated Edison Development Inc. | Power plant (Solar) | 46.1 km | 10 MW | [6] |
| Ocean County Landfill · NextEra Renewable Fuels, LLC | Power plant (Biomass) | 46.6 km | 14 MW | [6] |
| Dix Solar, L.L.C · Altus Power America Management, LLC | Power plant (Solar) | 48 km | 13 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Larrabee 230 kVPJM AI2-131 | Offshore wind | In study · proposed 2030-02 | 882 MW | [4] |
| Ocean WindPJM AE1-020 | Offshore wind | Suspended · proposed 2026-02 | 816 MW | [4] |
| Oyster Creek 230 kVPJM AI2-325 | Offshore wind | In study · proposed 2024-12 | 816 MW | [4] |
| Larrabee 230 kVPJM AI2-132 | Offshore wind | In study · proposed 2030-02 | 445 MW | [4] |
| Lakewood 230 kV IIPJM AI2-052 | Storage | In study · proposed 2027-06 | 170 MW | [4] |
| Lakewood 230 kVPJM AH2-269 | Storage | In study · proposed 2026-06 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | GlobeNet Tuckerton Cable Landing Stationway/1250867182 name=GlobeNet Tuckerton Cable Landing Station | [1] | Likely | 2026-09-27 | Shown |
| Also known as | GlobeNet Tuckerton CLSalt_name=GlobeNet Tuckerton CLS | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 376 East Main Street, Tuckerton, NJ 08087 | [1] | Likely | 2026-09-27 | Shown |
| Operator | GlobeNetoperator=GlobeNet | [1] | Likely | 2026-09-27 | Shown |
| Utility | Atlantic City Electric COterritory 963: ATLANTIC CITY ELECTRIC CO (INVESTOR OWNED, ATLANTIC CITY ELECTRIC | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Generation queued in county | 3.33 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 15.63¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 19.17¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 202 MW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 0.4 acres | [1] derived | Likely | 2026-09-27 | Shown |