Part of Google — Douglas County, GA campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityGoogle
- →substationGoogle Substation (230 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.29 km away. Proximity does not establish that it serves the site.
- →transmission230 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.17 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 33.75191, -84.58672
- County
- Douglas County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Greystone Power Corporation.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Georgia statewide average, July 2026.
- State avg. commercial price
Georgia statewide average, July 2026.
- Generation within 50 km
25 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 230 kV line | Transmission line | 0.17 km | 230 kV | [1] |
| 115 kV line · Georgia Power | Transmission line | 1.61 km | 115 kV | [1] |
| Jack Mcdonough · Georgia Power Co | Power plant (Natural Gas) | 13 km | 2.54 GW | [5] |
| Cnn Center · RREF IV-P CP III Marietta Street LLC | Power plant (Petroleum) | 17.7 km | 13 MW | [5] |
| Mas Asb Cogen Plant · Cube District Energy, LLC | Power plant (Natural Gas) | 20.8 km | 7 MW | [5] |
| Morgan Falls · Georgia Power Co | Power plant (Hydroelectric) | 30.5 km | 11 MW | [5] |
| Yates · Georgia Power Co | Power plant (Natural Gas) | 43.3 km | 714 MW | [5] |
| Hewlett Packard Enterprise · SWVP Alpharetta Owners, LLC | Power plant (Petroleum) | 47.4 km | 8 MW | [5] |
| Allatoona · USCE-Mobile District | Power plant (Hydroelectric) | 47.6 km | 72 MW | [5] |
| State Farm Support Center East · State Farm Mutual Auto Ins Co | Power plant (Petroleum) | 48.7 km | 11 MW | [5] |
| Google Substation · Georgia Power | Substation | 0.29 km | 230 kV | [1] |
| Georgia Power substation · Georgia Power | Substation | 1.2 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.54 km | 230 kV | [1] |
| Georgia Power substation · Georgia Power | Substation | 1.59 km | 23.47 kV | [1] |
| Georgia Power substation · Georgia Power | Substation | 1.59 km | 230 kV | [1] |
| Unnamed substation | Substation | 1.71 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational2003[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
Other buildings on this campus
1- GoogleOperating · 491,100 sq ft footprint
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Googleway/844352474 name=Google | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Googleoperator=Google | [1] | Likely | 2026-09-27 | Shown |
| Utility | Georgia Powerterritory 7140: GEORGIA POWER CO (INVESTOR OWNED, SOUTHERN COMPANY) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | SOCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Google Substation (230 kV)way/578435600 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 10.03¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.54¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.4 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 248,300 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| First operational | 2003start_date=2003 | [1] | Likely | 2026-09-27 | Shown |