DC
/

Google Pryor (North)

OperatingAI campusCampusPryor, Mayes County, Oklahoma
70% profile completeness
40 claims from 10 sources
Current facility power
442 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Likelyderived
Capital cost / investment
$13.9B[1]
Likelyestimated
First operational
Jul 19, 2024[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Public Service CO of Oklahoma · SPP
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
442 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionJul 19, 2024
    Model estimate · Satellite imagery
    • Jul 19, 2024 · Reported status: expanding[1]
    • Jul 19, 2024 · Construction start[1]
    • Jul 19, 2024 · Building 1 is operational, based on default roof-to-operational time.[1]
  3. EnergizationSep 6, 2026
    Satellite imagery
    • Sep 6, 2026 · Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.[1]
  4. OperationalSep 6, 2026
    Satellite imagery
    • Sep 6, 2026 · Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Google Pryor (North)
  2. substation
    On-site substation[1]
    Satellite imageryLikely
    3 substation outlines traced inside the campus on satellite imagery
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Public Service CO of Oklahoma[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[4]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
36.24564, -95.32436
Address
4581 Webb St, Pryor, OK 74361[1]Likely
County
Mayes County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Google[1]Confirmed
End user
Utility

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Grand River Dam Authority, Northeast Oklahoma Electric CO.

Power (all fields)

Current facility power
442 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
368 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
2,710 GWh/yr[3]Speculativeestimated

442 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[4]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
8.16¢/kWh[6]Confirmed

Oklahoma statewide average, July 2026.

State avg. commercial price
10.32¢/kWh[6]Confirmed

Oklahoma statewide average, July 2026.

Generation within 50 km
4.81 GW[7]Confirmedderived

8 EIA-reported plants within 50 km.

Generation queued in county
1.22 GW[5]Confirmedderived

7 active generation interconnection requests in Mayes County: Solar + storage 500 MW, Storage 374 MW, Solar 350 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Chouteau · Associated Electric Coop, IncPower plant (Natural Gas)5 km888 MW[7]
Grec · Grand River Dam AuthorityPower plant (Natural Gas)6.9 km960 MW[7]
Markham · Grand River Dam AuthorityPower plant (Hydroelectric)12.8 km126 MW[7]
Salina · Grand River Dam AuthorityPower plant (Pumped Storage)19.9 km242 MW[7]
Pensacola · Grand River Dam AuthorityPower plant (Hydroelectric)35.4 km115 MW[7]
Northeastern · Public Service Co of OklahomaPower plant (Natural Gas)39.6 km1.34 GW[7]
Oneta Energy Center · Oneta Power LLCPower plant (Natural Gas)42.4 km1.09 GW[7]
Fort Gibson · USCE-Tulsa DistrictPower plant (Hydroelectric)42.8 km51 MW[7]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2024-294 at Tulsa North - Igloo Valley 345 kV lineSPP GEN-2024-294Solar + storageIn study · proposed 2030-12500 MW[5]
GEN-2021-047 at Tulsa (Bus #509852) - Igloo (Bus #513596) 345kV lineSPP GEN-2021-047SolarIA signed · proposed 2028-12250 MW[5]
GEN-2023-SR27 at GRDA1 to CLARMR 5 161kV lineSPP GEN-2023-SR27StorageIA signed · proposed 2028-06102 MW[5]
GEN-2023-055 at Kerr Grove 161 kVSPP GEN-2023-055StorageIA signed · proposed 2029-06100 MW[5]
GEN-2020-092 at Pryor Junction - Midwest Carbide 138kV line SPP GEN-2020-092SolarIA signed · proposed 2028-11100 MW[5]
GEN-2019-002 at Maid 161kV substationSPP GEN-2019-002StorageIA signed · proposed 2027-11100 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Jul 19, 2024[1]
  5. First operational
    Jul 19, 2024[1]
  6. Expected completion
    —
Buildings (planned)
2[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
2[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Building 1operational63 MWJul 19, 2024[1]
Building 2operational379 MWSep 6, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$13.9B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
TPU v5p, TPU v5e[1]Confirmed
Compute (H100-equivalents)
636,700[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Current IT capacity
    53 MWJul 19, 2024[1]→368 MWSep 6, 2026[1]
  • Current facility power
    63 MWJul 19, 2024[1]→442 MWSep 6, 2026[1]
  • Buildings operational
    1Jul 19, 2024[1]→2Sep 6, 2026[1]
  • Status
    Operating + expandingJul 19, 2024[1]→OperatingSep 6, 2026[1]

Timeline

Construction start: Jul 19, 2024[1]
First operational: Jul 19, 2024[1]
  1. Jul 19, 202463 MW facility power· 1 buildings operational[1]

    Building 1 is operational, based on default roof-to-operational time.

  2. Jan 28, 202563 MW facility power· 1 buildings operational[1]

    Building 2 is being retrofitted from a warehouse. The roof is being painted white, and cooling towers and a new substation are being built just south of the building (based on later imagery).

  3. Oct 19, 202563 MW facility power· 1 buildings operational[1]

    The new substation for Building 2 looks mostly complete, half of the cooling towers are installed. The black patch in the top left of the building suggests that the new roof is not quite complete.

  4. May 26, 202663 MW facility power· 1 buildings operational[1]

    Building 2 looks almost complete, but still appears to have three cooling towers missing. We therefore expect another 3 months until full operation.

  5. Sep 6, 2026442 MW facility power· 2 buildings operational[1]

    Building 2 is operational, confirmed via RAAD drone imagery of spinning cooling tower fans on September 8th.

All claims (provenance audit)

40
FieldValueSourceConfidenceAs ofStatus
NameGoogle Pryor (North)[1] Likely2026-09-06Shown
StatusOperating + expanding[1] derivedLikely2024-07-19Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-01-28Superseded / alternative
StatusOperating + expanding[1] derivedLikely2025-10-19Superseded / alternative
StatusOperating + expanding[1] derivedLikely2026-05-26Superseded / alternative
StatusOperating[1] derivedLikely2026-09-06Shown
Facility typeAI campus[1] derivedLikely2026-09-06Shown
Address4581 Webb St, Pryor, OK 74361[1] Likely2026-09-06Shown
OwnerGoogleOwner: Google[1] Confirmed2026-09-06Shown
End usersGoogle DeepMindUsers: Google DeepMind[1] Speculative2026-09-06Shown
UtilityPublic Service CO of Oklahomaterritory 15474: PUBLIC SERVICE CO OF OKLAHOMA (INVESTOR OWNED, AMERICAN ELECTRI[2] derivedUnverified2022Shown
Current facility power442 MW[1] estimatedLikely2026-09-06Shown
Current facility power63 MW[1] estimatedLikely2024-07-19Superseded / alternative
Current facility power63 MW[1] estimatedLikely2025-01-28Superseded / alternative
Current facility power63 MW[1] estimatedLikely2025-10-19Superseded / alternative
Current facility power63 MW[1] estimatedLikely2026-05-26Superseded / alternative
Current IT capacity368 MW[1] estimatedLikely2026-09-06Shown
Current IT capacity53 MW[1] estimatedLikely2024-07-19Superseded / alternative
Current IT capacity53 MW[1] estimatedLikely2025-01-28Superseded / alternative
Current IT capacity53 MW[1] estimatedLikely2025-10-19Superseded / alternative
Current IT capacity53 MW[1] estimatedLikely2026-05-26Superseded / alternative
Estimated annual consumption2,710 GWh/yr[3] estimatedSpeculative2026-09-29Shown
ISO / RTOSPPSOUTHWEST POWER POOL[4] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Generation queued in county1.22 GW[5] derivedConfirmed2026-09-27Shown
State avg. industrial price8.16¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price10.32¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km4.81 GW[7] derivedConfirmed202502Shown
Buildings (planned)2[1] derivedLikely2026-09-06Shown
Buildings operational2[1] estimatedLikely2026-09-06Shown
Buildings operational1[1] estimatedLikely2024-07-19Superseded / alternative
Buildings operational1[1] estimatedLikely2025-01-28Superseded / alternative
Buildings operational1[1] estimatedLikely2025-10-19Superseded / alternative
Buildings operational1[1] estimatedLikely2026-05-26Superseded / alternative
Capital cost / investment$13.9B[1] estimatedLikely2026-09-06Shown
Compute (H100-equivalents)636,700[1] estimatedLikely2026-09-06Shown
Chip typesTPU v5p[1] Confirmed2026-09-06Shown
Chip typesTPU v5e[1] Confirmed2026-09-06Shown
Construction startJul 19, 2024[1] derivedLikely2026-09-06Shown
First operationalJul 19, 2024[1] derivedLikely2026-09-06Shown