Current facility power
Not yet sourced
Planned capacity
1 GW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
American Electric Power · ERCOT
Substation: Not identified

Power reality

Announced
1 GW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 1 GW announced.
  • ⚠ No public interconnection record for this load — ERCOT does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 1 GW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 1000 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Hut 8 Beacon Point
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    American Electric Power[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    ERCOT[2]
    Service territoryLikely
    Balancing authority: ERCO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
27.72733, -97.64308
County
Nueces County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer
Hut 8[1]Confirmed

“Hut8 / Data Center Corpus Christi, TX”

Utility

“Hut8 / Data Center Corpus Christi, TX” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
1 GW[1]Likely

“$17 billion, 1 GW data center project to support AI at the Beacon Point site”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
ERCO[3]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
4.44 GW[6]Confirmedderived

21 EIA-reported plants within 50 km.

Generation queued in county
2.1 GW[4]Confirmedderived

10 active generation interconnection requests in Nueces County: Storage 1,082 MW, Solar 668 MW, Gas 351 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Patriot Wind Farm · Avangrid Power LLCPower plant (Wind)16.3 km226 MW[6]
Chapman Ranch Wind I · Chapman Ranch Wind LLCPower plant (Wind)20.5 km249 MW[6]
Corpus Christi Energy Center · Corpus Christi Cogeneration LLCPower plant (Natural Gas)23.2 km506 MW[6]
Nueces Bay · City of San Antonio - (TX)Power plant (Natural Gas)24.3 km633 MW[6]
El Algodon Alto Wind Farm, LLC · El Algodon Alto Wind Farm, LLCPower plant (Wind)31.1 km200 MW[6]
Barney M Davis · City of San Antonio - (TX)Power plant (Natural Gas)35.3 km925 MW[6]
Gregory Power Plant · Gregory Power Partners LLCPower plant (Natural Gas)41.9 km366 MW[6]
Ingleside Cogeneration · Ingleside Cogeneration LPPower plant (Natural Gas)43 km460 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Sunscape Renewable Energy Solar SLFERCOT 27INR0047 · Sunscape Renewable Energy LLCSolarIA signed · proposed 2028-10523 MW[4]
NavBoot BESSERCOT 25INR0375 · Navboot BESS LLCStorageIA signed · proposed 2027-11304 MW[4]
Blanquilla BESSERCOT 24INR0528 · Blanquilla BESS LLCStorageIA signed · proposed 2028-05201 MW[4]
Barbara BESSERCOT 28INR0437 · Barbara BESS LLCStorageIn study · proposed 2028-05201 MW[4]
Jalisco PeakerERCOT 28INR0121 · HEP Power Generation, LLCGasIn study · proposed 2029-05184 MW[4]
Jalisco CogenERCOT 27INR0337 · HEP Power Generation, LLCGasIn study · proposed 2029-05168 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
1 GW[1]Likely

“$17 billion, 1 GW data center project to support AI at the Beacon Point site”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperHut 8[1] Confirmed2026-09-11Shown
UtilityAmerican Electric Power[1] Confirmed2026-09-11Shown
Planned capacity1 GW[1] Likely2026-09-11Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[2] derivedLikely—Shown
Balancing authorityERCO[3] derivedLikely—Shown
Generation queued in county2.1 GW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.44 GW[6] derivedConfirmed202502Shown