DC
/

Texas

Facilities
195
21 campuses
Power online
1.79 GW
9 sites reporting
Under construction
8.17 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
14
1.79 GW online · 7.17 GW pipeline
AI compute
1.50M
H100-equivalents (est.)
Capital (reported + est.)
$59.2B
$2.99B assessed

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 7.07¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW2.25 GW4.5 GW6.75 GW9 GW20252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027
2028
2029

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced12.67 GW
  • Interconnection requests—
  • Contracted / approved800 MW
  • Under construction5.92 GW
  • Operational1.79 GW

Plus 366 MW of documented on-site / dedicated generation.

4.36 GW announced at 8 sites has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 15Under construction: 6Announced only: 6Unverified: 168

Interconnection queues

Active requests to connect to the grid (ERCOT, MISO, SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection439.44 GW · 1,692 requests
Storage 160.77 GWSolar 143.32 GWGas 79.3 GWWind 47.93 GW
ERCOT · Large loads seeking interconnection
410 GW
~87% data centers · as of 2026-03-26

“ERCOT is tracking approximately 410 GW of Large Loads seeking interconnection of which ~87% are data centers.”

ERCOT, 2026-04-09

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
West Texas (Abilene)3590 MW3.49 GW
Austin & Central Texas19198 MW1.23 GW
Dallas–Fort Worth79583 MW120 MW
San Antonio65217 MW134 MW
Houston8——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • ERCOT1.79 GW + 5.88 GW · 176 sites
  • SPP0 MW + 1.29 GW · 2 sites
  • None (non-RTO region)0 MW + 1 GW · 6 sites
  • MISO— · 11 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
OpenAI Stargate ShackelfordUnder construction—1.96 GW
GoodnightUnder construction—1.29 GW
OpenAI Stargate MilamUnder construction—1.2 GW
OpenAI Stargate AbileneOperating + expanding590 MW590 MW
Meta El Paso Data CenterUnder construction—1 GW
Crusoe Abilene ExpansionUnder construction—941 MW
Coreweave HeliosOperating + expanding200 MW600 MW
CoreWeave Denton TXOperating + expanding367 MW28 MW
Anthropic Barber LakeUnder construction—300 MW
Meta TempleOperating + expanding198 MW33 MW
Google Red OakOperating + expanding93 MW92 MW
Vantage TX1Operating + expanding45 MW134 MW
Google MidlothianOperating123 MW—
Microsoft SAT40Operating106 MW—
Microsoft SAT14Operating66 MW—

Facilities by status

  • Operating177
  • Operating + expanding6
  • Under construction6
  • Unknown6