DC
/

Hut 8 West Feliciana

UnknownUnclassifiedCampusWest Feliciana Parish, Louisiana
10% profile completeness
9 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
1 GW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2027 – H1 2029
Medium confidencewindow, not a prediction
Project verification
Grid-backed
Interconnection agreement / service contract documented by utility filing / announcement.
Current stage
Interconnection agreement / service contract
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: Not identified

Power reality

Announced
1 GW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
330 MW[1]
Reported utility / power contract
Under construction
No record
Operational
No record
  • ⚠ Announced 1 GW is 3.0× the 330 MW documented by grid, construction or operating records.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Interconnection agreement / service contract (furthest stage with documented evidence)[1]
  • Required: 1 GW
Assumptions
  • From “Interconnection agreement / service contract”, large loads have typically taken 0.75–2.5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2027 – H1 2029

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 1000 MW[1]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contractSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Contracted / committed power: 330 MW[1]
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Hut 8 West Feliciana
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Entergy[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    MISO[2]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
30.88053, -91.41142
County
West Feliciana Parish
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer
Hut 8[1]Confirmed

“Hut 8 / Data Center West Feliciana Parish, LA”

Utility
Entergy[1]Confirmed

“Hut 8 / Data Center West Feliciana Parish, LA” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
1 GW[1]Likely

“Entergy Louisiana to provide 330 MW initially, with potential to expand to 1,000 MW.” — Potential expansion.

Contracted / committed power
330 MW[1]Likely

“Entergy Louisiana to provide 330 MW initially, with potential to expand to 1,000 MW.”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[3]Likelyderived

Control area of the containing utility territory.

Contracted / committed power
330 MW[1]Likely

“Entergy Louisiana to provide 330 MW initially, with potential to expand to 1,000 MW.”

State avg. industrial price
6.08¢/kWh[4]Confirmed

Louisiana statewide average, July 2026.

State avg. commercial price
10.97¢/kWh[4]Confirmed

Louisiana statewide average, July 2026.

Generation within 50 km
4.26 GW[5]Confirmedderived

13 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
River Bend · Entergy Louisiana LLCPower plant (Nuclear)15.7 km976 MW[5]
Big Cajun 2 · Louisiana Generating LLCPower plant (Coal)17.6 km1.67 GW[5]
Big Cajun 1 · Louisiana Generating LLCPower plant (Natural Gas)23.6 km367 MW[5]
Oxbow Solar 1 · Lightsource Renewable Energy Asset Management, LLCPower plant (Solar)23.7 km300 MW[5]
Sidney A Murray Jr Hydroelectric · First National Bank-CommercePower plant (Hydroelectric)30.4 km192 MW[5]
Formosa Plastics · Formosa Plastics CorpPower plant (Natural Gas)47.5 km82 MW[5]
Louisiana 1 · Entergy Louisiana LLCPower plant (Natural Gas)48.2 km382 MW[5]
Louisiana 2 · Entergy Louisiana LLCPower plant (Natural Gas)48.2 km138 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
1 GW[1]Likely

“Entergy Louisiana to provide 330 MW initially, with potential to expand to 1,000 MW.” — Potential expansion.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperHut 8[1] Confirmed2026-09-11Shown
UtilityEntergy[1] Confirmed2026-09-11Shown
Planned capacity1 GW[1] Likely2026-09-11Shown
Contracted / committed power330 MW[1] Likely2026-09-11Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[2] derivedLikely—Shown
Balancing authorityMISO[3] derivedLikely—Shown
State avg. industrial price6.08¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price10.97¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km4.26 GW[5] derivedConfirmed202502Shown