DC
/

Louisiana

Facilities
7
3 campuses
Power online
0 MW
0 sites reporting
Under construction
5 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
2
0 MW online · 5 GW pipeline
AI compute
—
H100-equivalents (est.)
Capital (reported + est.)
$50B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 6.08¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW750 MW1.5 GW2.25 GW3 GW20282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced6.21 GW
  • Interconnection requests—
  • Contracted / approved330 MW
  • Under construction2.2 GW
  • Operational—

210 MW announced at 1 site has no grid, construction or operating record yet.

Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Grid-backed: 1Announced only: 1Unverified: 4

Interconnection queues

Active requests to connect to the grid (MISO, SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection23.59 GW · 116 requests
Solar 12.86 GWGas 4.3 GWStorage 2.78 GWHybrid 2.27 GWWind 536 MWUnknown 467 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
North Louisiana1—5 GW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • Meta0 MW + 5 GW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • MISO0 MW + 5 GW · 6 sites
  • SPP— · 1 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Meta HyperionOperating + expanding—5 GW

Facilities by status

  • Operating4
  • Operating + expanding1
  • Unknown2