DC
/

Iron City No. 1 Power Generator and Compute Center

OperatingUnclassifiedSiteKarthaus, Clearfield County, Pennsylvania
20% profile completeness
10 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Pennsylvania Electric CO · PJM
Substation: Not identified

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Iron City No. 1 Power Generator and Compute Center
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Pennsylvania Electric CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Street address
Coordinates
41.14104, -78.09741
Address
3160 Paul Hoddman Road, Karthaus, PA[1]Likely
County
Clearfield County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: United Electric Coop, INC - (Pa).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
11.04¢/kWh[5]Confirmed

Pennsylvania statewide average, July 2026.

State avg. commercial price
13.86¢/kWh[5]Confirmed

Pennsylvania statewide average, July 2026.

Generation within 50 km
796 MW[6]Confirmedderived

8 EIA-reported plants within 50 km.

Generation queued in county
1.59 GW[4]Confirmedderived

24 active generation interconnection requests in Clearfield County: Solar + storage 785 MW, Solar 598 MW, Wind 110 MW, Storage 100 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Un-School House LLC · BCD Project Holdings 1, LLCPower plant (Solar)20.9 km20 MW[6]
Shawville · Shawville Power, LLCPower plant (Natural Gas)24 km602 MW[6]
University Park Solar · SS PA II PSU LLCPower plant (Solar)41.8 km2 MW[6]
East Campus Steam Plant · Penn State UniversityPower plant (Natural Gas)42.4 km7 MW[6]
West Campus Steam Plant · Penn State UniversityPower plant (Natural Gas)43.4 km9 MW[6]
Sandy Ridge Wind 2, LLC · Algonquin Power CoPower plant (Wind)45.2 km88 MW[6]
Cl-Viaduct LLC · BCD Project Holdings 1, LLCPower plant (Solar)47.6 km20 MW[6]
Sandy Ridge Wind Farm · Algonquin Power CoPower plant (Wind)48.5 km48 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Moshannon-Milesburg 230 kV IVPJM AF1-142 - moved to TC1Solar + storageIn study · proposed 2022-04329 MW[4]
Mainesburg-Homer City 345kVPJM AH1-624SolarIn study · proposed 2025-12230 MW[4]
Moshannon-Milesburg 230 kV VIIIPJM AI1-039Solar + storageIn study · proposed 2025-06200 MW[4]
Moshannon-Milesburg 230 kV IIIPJM AF1-099 - moved to TC1Solar + storageIn study · proposed 2022-04127 MW[4]
Rogue's WindPJM AF1-086WindUnder construction · proposed 2026-09110 MW[4]
Imperial-Joffre 138 kVPJM AG2-688StorageIn study · proposed 2024-06100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

10
FieldValueSourceConfidenceAs ofStatus
NameIron City No. 1 Power Generator and Compute Centernode/13908533343 name=Iron City No. 1 Power Generator and Compute Center[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Address3160 Paul Hoddman Road, Karthaus, PA[1] Likely2026-09-27Shown
UtilityPennsylvania Electric COterritory 14711: PENNSYLVANIA ELECTRIC CO (INVESTOR OWNED, FIRSTENERGY CORP)[2] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Generation queued in county1.59 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price11.04¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.86¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km796 MW[6] derivedConfirmed202502Shown