Liberty Center One
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityLiberty Center One
- →substationFormtech Substation (120 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.49 km away. Proximity does not establish that it serves the site.
- →transmissionApache - Troy (120 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.45 km away). Not confirmed as the supply path.
- →utilityNot identifiedUnknownUnverified
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
ApproximateLocation is approximate (approximate); the marker does not identify the exact site.
- Coordinates
- 42.53348, -83.17749
- Address
- County
- Oakland County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
No tenants or end users identified in our sources yet.
No ownership information sourced yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Michigan statewide average, July 2026.
- State avg. commercial price
Michigan statewide average, July 2026.
- Generation within 50 km
21 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Apache - Troy · ITC | Transmission line | 0.45 km | 120 kV | [1] |
| Chestnut - Troy;Lincoln - Troy · ITC | Transmission line | 0.46 km | 120 kV | [1] |
| 120 kV line | Transmission line | 0.47 km | 120 kV | [1] |
| Formtech Tap #2 · DTE Energy | Transmission line | 0.48 km | 120 kV | [1] |
| Formtech Tap #1 · DTE Energy | Transmission line | 0.48 km | 120 kV | [1] |
| Formtech Tap #1;Formtech Tap #2 · DTE Energy | Transmission line | 0.5 km | 120 kV | [1] |
| Northeast (Mi) · DTE Electric Company | Power plant (Natural Gas) | 14.7 km | 101 MW | [5] |
| Hancock · DTE Electric Company | Power plant (Natural Gas) | 21.8 km | 93 MW | [5] |
| Dearborn Industrial Generation · Dearborn Industrial Gen Inc | Power plant (Natural Gas) | 25.7 km | 739 MW | [5] |
| Dearborn Energy Center · DTE Electric Company | Power plant (Natural Gas) | 26.7 km | 27 MW | [5] |
| Delray · DTE Electric Company | Power plant (Natural Gas) | 27.3 km | 127 MW | [5] |
| Grs Arbor Hills · Gas Recovery Systems Inc | Power plant (Biomass) | 34.8 km | 24 MW | [5] |
| Wyandotte · Wyandotte Municipal Serv Comm | Power plant (Natural Gas) | 36.3 km | 48 MW | [5] |
| Superior · DTE Electric Company | Power plant (Petroleum) | 48.5 km | 52 MW | [5] |
| Formtech Substation · DTE Energy | Substation | 0.49 km | 120 kV | [1] |
| Troy Substation · ITC | Substation | 0.56 km | 120 kV | [1] |
| Mandalay Substation · DTE Energy | Substation | 0.66 km | 40 kV | [1] |
| Normandy Substation · DTE Energy | Substation | 0.87 km | 40 kV | [1] |
| Dudley Substation · DTE Energy | Substation | 1.51 km | 40 kV | [1] |
| Dakota Substation · DTE Energy | Substation | 1.53 km | 40 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Liberty Center Onerelation/12901583 name=Liberty Center One | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.libertycenterone.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 4815 Delemere Avenue, Royal Oak, MI 48073 | [1] | Likely | 2026-09-27 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [2] derived | Likely | — | Shown |
| Balancing authority | MISO | [3] derived | Likely | — | Shown |
| Nearest mapped substation | Formtech Substation (120 kV)way/215326843 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 120 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.81¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 16.46¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.3 GW | [5] derived | Confirmed | 202502 | Shown |