DC
/

Michigan

Facilities
13
1 campuses
Power online
0 MW
0 sites reporting
Under construction
1.4 GW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
0 MW online · 1.4 GW pipeline
AI compute
—
H100-equivalents (est.)
Capital (reported + est.)
$7B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 9.81¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW500 MW1 GW1.5 GW2 GW2029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced1.4 GW
  • Interconnection requests—
  • Contracted / approved1.38 GW
  • Under construction1.38 GW
  • Operational—
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Grid-backed: 1Unverified: 12

Interconnection queues

Active requests to connect to the grid (MISO, PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection54.37 GW · 297 requests
Solar 20.87 GWStorage 13.86 GWGas 9.03 GWWind 4.81 GWUnknown 2.45 GWHybrid 1.64 GWSolar + storage 950 MWNuclear 735 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Northern Indiana (New Carlisle)1——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • OpenAI0 MW + 1.4 GW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • MISO0 MW + 1.4 GW · 12 sites
  • PJM— · 1 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
OpenAI Stargate MichiganUnder construction—1.4 GW

Facilities by status

  • Operating12
  • Under construction1