Lumos Networks
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityLumos Networks
- →substationBlackwater (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.44 km away. Proximity does not establish that it serves the site.
- →transmission69 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.49 km away). Not confirmed as the supply path.
- →utilityAmerican Electric Power[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
| Queue | Relationship | Stage | MW req. | MW appr. | Queued | Expected in service | POI / TO | Source · as of |
|---|---|---|---|---|---|---|---|---|
PJM AB2-109 Reusens Hydro Electric Generating Plant · Hydro | Possibly related generation Speculative Generation request name/developer shares “electric” with this facility, in the same county. Not confirmed as serving it. | In service In Service; feasibility: Document Posted; system impact: Document Posted; facilities: Not Required; ISA/GIA: Document Posted | 12.5 | 4 | Apr 28, 2016 | In service Nov 29, 2017 | Reusens 34.5kV TO: AEP | [4] Sep 27, 2026 |
On-site & dedicated generation
- PJM AB2-109 Reusens Hydro Electric Generating Plant (Hydro, 12.5 MW requested)[4]Generation request name/developer shares “electric” with this facility, in the same county. Not confirmed as serving it.HydroArrangement unknown13 MWSpeculative
Location & imagery
Street address- Coordinates
- 37.41569, -79.14271
- County
- Lynchburg
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
17 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Lynchburg: Storage 40 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 69 kV line · Appalachian Power Company | Transmission line | 0.49 km | 69 kV | [1] |
| Reusens · Eagle Creek Renewable Energy, LLC | Power plant (Hydroelectric) | 6.6 km | 13 MW | [6] |
| Depot Solar Center, LLC · Emerald Hills Holding I, LLC | Power plant (Solar) | 15.7 km | 15 MW | [6] |
| Georgia-Pacific Big Island · GP Big Island LLC | Power plant (Biomass) | 23 km | 7 MW | [6] |
| Caden Energix Pamplin LLC · Caden Energix Pamplin LLC | Power plant (Solar) | 34.7 km | 16 MW | [6] |
| Altavista Solar · Altavista Solar, LLC | Power plant (Solar) | 34.8 km | 80 MW | [6] |
| Altavista Power Station · Virginia Electric & Power Co | Power plant (Biomass) | 35 km | 51 MW | [6] |
| Leesville · Appalachian Power Co | Power plant (Hydroelectric) | 42.6 km | 50 MW | [6] |
| Water Strider Solar · Consolidated Edison Development Inc. | Power plant (Solar) | 45.6 km | 80 MW | [6] |
| Blackwater | Substation | 0.44 km | 69 kV | [1] |
| Elm Street Substation · Appalachian Power Company | Substation | 1.31 km | 69 kV | [1] |
| Dearington Substation | Substation | 2.05 km | 69 kV | [1] |
| Rivermont Substation · Appalachian Power Company | Substation | 2.9 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Reusens 12.47 kVPJM AG2-202 | Storage | In study · proposed 2022-10 | 20 MW | [4] |
| Perkins Park 12.47 kVPJM AG2-203 | Storage | In study · proposed 2022-10 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Lumos Networksnode/5225685660 name=Lumos Networks | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | American Electric Powerterritory 733: APPALACHIAN POWER CO (INVESTOR OWNED, AMERICAN ELECTRIC POWER CO) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Blackwater (69 kV)way/560590868 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 69 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 40 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 341 MW | [6] derived | Confirmed | 202502 | Shown |