DC
/

Virginia

Facilities
487
7 campuses
Power online
4.3 GW
55 sites reporting
Under construction
586 MW
planned MW at active sites
Planned
—
77 planned sites (MW not disclosed)
AI campuses
7
1.31 GW online · 586 MW pipeline
AI compute
1.07M
H100-equivalents (est.)
Capital (reported + est.)
$39.5B
$10.1B assessed

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.07¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW500 MW1 GW1.5 GW2 GW202420252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027
2028

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced1.02 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction586 MW
  • Operational5.61 GW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 280Under construction: 58Documented development: 88Unverified: 61

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection75.85 GW · 645 requests
Solar 31.74 GWStorage 24.93 GWGas 8.76 GWSolar + storage 6.61 GWOffshore wind 3.29 GW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Northern Virginia4373.4 GW369 MW
Richmond28901 MW217 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • PJM4.3 GW + 586 MW · 487 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
STACK Infrastructure NVA02Operating + expanding118 MW369 MW
QTS Richmond 3Operating + expanding202 MW134 MW
QTS Richmond 1Operating333 MW—
Google BristowOperating286 MW—
CloudHQ LC1Operating264 MW—
QTS Richmond 2Operating252 MW—
CoreWeave Chester VAOperating + expanding114 MW83 MW
Digital Realty IAD39Operating192 MW—
CloudHQ LC2Operating162 MW—
Digital Realty IAD41Operating135 MW—
CloudHQ LC3Operating132 MW—
Digital Realty IAD42Operating90 MW—
Digital Realty IAD43Operating90 MW—
CyrusOne NVA1/NVA2/NVA3Operating85 MW—
QTS Ashburn 3 DC1Operating80 MW—

Facilities by status

  • Operating332
  • Operating + expanding3
  • Under construction75
  • Planned77