MARA Data Center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMARA Data Center
- →substationWolf Hollow Substation (345 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.52 km away. Proximity does not establish that it serves the site.
- →transmission345 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.3 km away). Not confirmed as the supply path.
- →utilityTri-County Electric Coop, INC (Tx)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Wolf Hollow II (Natural Gas, 1103 MW) is 0.6 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityNatural gasCo-located1.1 GWUnverified
- Wolf Hollow I LP (Natural Gas, 756 MW) is 0.9 km away[6]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityNatural gasCo-located756 MWUnverified
Location & imagery
Mapped outline- Coordinates
- 32.34232, -97.73124
- Address
- County
- Hood County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: United Electric Coop Service INC - (Tx), Texas-New Mexico Power CO, Oncor Electric Delivery Company LLC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
12 EIA-reported plants within 50 km.
- Generation queued in county
4 active generation interconnection requests in Hood County: Storage 307 MW, Gas 306 MW, Solar 148 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.27 km | 138 kV | [1] |
| 345 kV line | Transmission line | 0.3 km | 345 kV | [1] |
| Wolf Hollow II · Constellation Power, Inc | Power plant (Natural Gas) | 0.6 km | 1.1 GW | [6] |
| Wolf Hollow I LP · Wolf Hollow I Power, LLC | Power plant (Natural Gas) | 0.9 km | 756 MW | [6] |
| Comanche Peak · Luminant Generation Company LLC | Power plant (Nuclear) | 7.1 km | 2.4 GW | [6] |
| Decordova Steam Electric Station · Luminant Generation Company LLC | Power plant (Natural Gas) | 7.3 km | 534 MW | [6] |
| Walnut Springs Solar · Cypress Creek Renewables | Power plant (Solar) | 29.5 km | 5 MW | [6] |
| Johnson County · Johnson County Power LLC | Power plant (Natural Gas) | 31 km | 267 MW | [6] |
| Tpe Erath Solar, LLC · Navisun LLC | Power plant (Solar) | 45.6 km | 10 MW | [6] |
| Tpe Whitney Solar, LLC · Cardinal Renewables | Power plant (Solar) | 48.4 km | 10 MW | [6] |
| Wolf Hollow Substation · Oncor | Substation | 0.52 km | 345 kV | [1] |
| Wolf Hollow Substation | Substation | 0.77 km | 345 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Wolf Hollow IIIERCOT 24INR0567 · Wolf Hollow II Power LLC | Gas | In study · proposed 2027-05 | 306 MW | [4] |
| Apache Hill BESSERCOT 25INR0231 · APACHE HILL ENERGY CENTER | Storage | IA signed · proposed 2026-10 | 201 MW | [4] |
| Rain Lily Solar 1ERCOT 27INR0288 · Rain Lily Solar 1 LLC | Solar | In study · proposed 2028-10 | 148 MW | [4] |
| Rain Lily Storage 1ERCOT 27INR0285 · Rain Lily Storage One, LLC | Storage | In study · proposed 2028-10 | 106 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | MARA Data Centerway/1301559332 name=MARA Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.maragranbury.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 2001 Mitchell Bend Highway, Granbury, TX | [1] | Likely | 2026-09-27 | Shown |
| Operator | Marathon Digital Holdingsoperator=Marathon Digital Holdings | [1] | Likely | 2026-09-27 | Shown |
| Utility | Tri-County Electric Coop, INC (Tx)territory 19159: TRI-COUNTY ELECTRIC COOP, INC (TX) (COOPERATIVE, TRI-COUNTY ELE | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Wolf Hollow Substation (345 kV)way/862801075 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.5 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 761 MW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 5.1 GW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 40.7 acres | [1] derived | Likely | 2026-09-27 | Shown |