Meta data center
Part of Meta — DeKalb County, IL campus
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMeta data center
- →substationMeta substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.42 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.88855, -88.72181
- County
- DeKalb County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
49 EIA-reported plants within 50 km.
- Generation queued in county
18 active generation interconnection requests in DeKalb County: Solar 2,180 MW, Solar + storage 300 MW, Storage 186 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.23 km | 138 kV | [1] |
| Fpl Energy Illinois Wind LLC Hybrid · FPL Energy Illinois Wind LLC | Power plant (Wind) | 19.2 km | 238 MW | [6] |
| Shady Oaks Wind Farm · Algonquin Power Co | Power plant (Wind) | 37.3 km | 110 MW | [6] |
| Shady Oaks Wind 2 · Shady Oaks Wind 2, LLC | Power plant (Wind) | 37.4 km | 108 MW | [6] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 41.4 km | 489 MW | [6] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 41.8 km | 991 MW | [6] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 45.9 km | 336 MW | [6] |
| Nrg Rockford II Energy Center · Rockford Generation LLC | Power plant (Natural Gas) | 49.9 km | 181 MW | [6] |
| Nrg Rockford I · Rockford Generation LLC | Power plant (Natural Gas) | 50 km | 362 MW | [6] |
| Meta substation · Meta | Substation | 0.42 km | 138 kV | [1] |
| Unnamed substation | Substation | 0.44 km | 138 kV | [1] |
| Unnamed substation | Substation | 1.63 km | — | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Sugar Grove-Waterman 138kVPJM AG1-118 - moved to TC1 | Solar | In study · proposed 2023-12 | 300 MW | [4] |
| Sugar Grove-Waterman 138kVPJM AI2-408 | Solar | In study · proposed 2026-12 | 300 MW | [4] |
| Wayne-Byron 345 kVPJM AI2-409 | Solar | In study · proposed 2026-12 | 300 MW | [4] |
| Wayne 345kV (CIR Increase)PJM AI2-417 | Solar | In study · proposed 2026-12 | 200 MW | [4] |
| Crego Rd 138 kVPJM AG1-127 - moved to TC1 | Solar | In study · proposed 2023-12 | 190 MW | [4] |
| Sandwich 34kVPJM AI1-147 | Solar | In study · proposed 2026-12 | 150 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
2- Meta data centerOperating · 568,900 sq ft footprint
- Meta data centerOperating · 320,400 sq ft footprint
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Metaoperator=Meta | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Meta substation (138 kV)way/1263612311 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 2.67 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 11.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.13 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 568,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |