Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityMeta Jeffersonville
- →substationOn-site substation[1]Satellite imageryLikely2 substation outlines traced inside the campus on satellite imagery
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 38.36947, -85.66454
- Address
- County
- Clark County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
Power (all fields)
- Current facility power
Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.
- Current IT capacity
Estimated IT load currently online, based on buildings observed operational.
- Estimated annual consumption
241 MW × 8,760 h × 70% utilization.
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Indiana statewide average, July 2026.
- State avg. commercial price
Indiana statewide average, July 2026.
- Generation within 50 km
12 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Clark County: Solar 200 MW, Storage 200 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Ohio Falls · Louisville Gas & Electric Co | Power plant (Hydroelectric) | 13.9 km | 101 MW | [7] |
| Bluegrass Generating Station · East Kentucky Power Coop, Inc | Power plant (Natural Gas) | 22 km | 501 MW | [7] |
| Paddys Run · Louisville Gas & Electric Co | Power plant (Natural Gas) | 22.4 km | 170 MW | [7] |
| Cane Run · Louisville Gas & Electric Co | Power plant (Natural Gas) | 28.5 km | 691 MW | [7] |
| Trimble County · Louisville Gas & Electric Co | Power plant (Coal) | 32.5 km | 2.18 GW | [7] |
| Scottsburg Solar Park · Indiana Municipal Power Agency | Power plant (Solar) | 34.2 km | 7 MW | [7] |
| Mill Creek (Ky) · Louisville Gas & Electric Co | Power plant (Coal) | 41.3 km | 1.17 GW | [7] |
| Clifty Creek · Indiana-Kentucky Electric Corp | Power plant (Coal) | 46.1 km | 1.17 GW | [7] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J2538 at Speed - Trimble (LGEE) 345.0kVMISO J2538 | Solar | In study · proposed 2026-03 | 200 MW | [5] |
| J2586 at SPEED 345MISO J2586 | Storage | In study · proposed 2025-04 | 200 MW | [5] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startFeb 1, 2024[1]
- First operationalJun 4, 2026[1]
- Expected completion—
- Buildings (planned)
Count of building outlines traced on satellite imagery.
- Buildings operational
| Phase | Status | Added MW | Completed / expected | Source |
|---|---|---|---|---|
| Buildings 1–2 | operational | 241 MW | Jun 4, 2026 | [1] |
Real estate
None sourced yet
None sourced yet
None sourced yet
- Capital cost / investment
Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
What changed (last 3 years)
Follow this facility (RSS)Timeline
All claims (provenance audit)
27| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Meta Jeffersonville | [1] | Likely | 2026-06-04 | Shown |
| Status | Under construction | [1] derived | Likely | 2024-02-01 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-03-06 | Superseded / alternative |
| Status | Operating | [1] derived | Likely | 2026-06-04 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-06-04 | Shown |
| Address | 500 8th St, Jeffersonville, IN 47130, USA | [1] | Likely | 2026-06-04 | Shown |
| Owner | MetaOwner: Meta | [1] | Confirmed | 2026-06-04 | Shown |
| End users | MetaUsers: Meta | [1] | Confirmed | 2026-06-04 | Shown |
| Utility | Duke Energyterritory 15470: DUKE ENERGY INDIANA, LLC (INVESTOR OWNED, DUKE ENERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| Current facility power | 241 MW | [1] estimated | Likely | 2026-06-04 | Shown |
| Current IT capacity | 178 MW | [1] estimated | Likely | 2026-06-04 | Shown |
| Estimated annual consumption | 1,478 GWh/yr | [3] estimated | Speculative | 2026-09-29 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [4] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Generation queued in county | 400 MW | [5] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.16¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.30¢/kWh | [6] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 6 GW | [7] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 2 | [1] derived | Likely | 2026-06-04 | Shown |
| Buildings operational | 2 | [1] estimated | Likely | 2026-06-04 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2024-02-01 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-03-06 | Superseded / alternative |
| Capital cost / investment | $6.7B | [1] estimated | Likely | 2026-06-04 | Shown |
| Compute (H100-equivalents) | 203,100 | [1] estimated | Likely | 2026-06-04 | Shown |
| Chip types | B300 | [1] | Confirmed | 2026-06-04 | Shown |
| Construction start | Feb 1, 2024 | [1] derived | Likely | 2026-06-04 | Shown |
| First operational | Jun 4, 2026 | [1] derived | Likely | 2026-06-04 | Shown |