DC
/

Meta Jeffersonville

OperatingAI campusCampusJeffersonville, Clark County, Indiana
70% profile completeness
27 claims from 10 sources
Current facility power
241 MW[1]
Likelyestimated
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Likelyderived
Capital cost / investment
$6.7B[1]
Likelyestimated
First operational
Jun 4, 2026[1]
Likelyderived

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Energized — operating
High confidence
Project verification
Verified operating
Operation documented by satellite imagery.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Duke Energy · MISO
Substation: On-site substation

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
241 MW[1]
Estimated from buildings observed operational
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionFeb 1, 2024
    Model estimate · Satellite imagery
    • Feb 1, 2024 · Reported status: under construction[1]
    • Feb 1, 2024 · Construction start[1]
    • Feb 1, 2024 · Land clearing begins.[1]
  3. EnergizationJun 4, 2026
    Satellite imagery
    • Jun 4, 2026 · Building 1 and 2 are operational.[1]
  4. OperationalJun 4, 2026
    Satellite imagery
    • Jun 4, 2026 · Building 1 and 2 are operational.[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.

Grid path

  1. facility
    Meta Jeffersonville
  2. substation
    On-site substation[1]
    Satellite imageryLikely
    2 substation outlines traced inside the campus on satellite imagery
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Duke Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[4]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
38.36947, -85.66454
Address
500 8th St, Jeffersonville, IN 47130, USA[1]Likely
County
Clark County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
Power supply
Utility:
Duke Energy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Owner
Meta[1]Confirmed
End user
Meta[1]Confirmed
Utility
Duke Energy[2]Unverified

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Harrison County Rural E M C, Clark County Rural E M C - (In).

Power (all fields)

Current facility power
241 MW[1]Likelyestimated

Estimated total facility power (IT plus cooling and overhead) at the latest observed milestone.

Current IT capacity
178 MW[1]Likelyestimated

Estimated IT load currently online, based on buildings observed operational.

Estimated annual consumption
1,478 GWh/yr[3]Speculativeestimated

241 MW × 8,760 h × 70% utilization.

Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[4]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
MISO[2]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
9.16¢/kWh[6]Confirmed

Indiana statewide average, July 2026.

State avg. commercial price
13.30¢/kWh[6]Confirmed

Indiana statewide average, July 2026.

Generation within 50 km
6 GW[7]Confirmedderived

12 EIA-reported plants within 50 km.

Generation queued in county
400 MW[5]Confirmedderived

2 active generation interconnection requests in Clark County: Solar 200 MW, Storage 200 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Ohio Falls · Louisville Gas & Electric CoPower plant (Hydroelectric)13.9 km101 MW[7]
Bluegrass Generating Station · East Kentucky Power Coop, IncPower plant (Natural Gas)22 km501 MW[7]
Paddys Run · Louisville Gas & Electric CoPower plant (Natural Gas)22.4 km170 MW[7]
Cane Run · Louisville Gas & Electric CoPower plant (Natural Gas)28.5 km691 MW[7]
Trimble County · Louisville Gas & Electric CoPower plant (Coal)32.5 km2.18 GW[7]
Scottsburg Solar Park · Indiana Municipal Power AgencyPower plant (Solar)34.2 km7 MW[7]
Mill Creek (Ky) · Louisville Gas & Electric CoPower plant (Coal)41.3 km1.17 GW[7]
Clifty Creek · Indiana-Kentucky Electric CorpPower plant (Coal)46.1 km1.17 GW[7]
Largest queued generation in this countyFuelQueue statusMWSource
J2538 at Speed - Trimble (LGEE) 345.0kVMISO J2538SolarIn study · proposed 2026-03200 MW[5]
J2586 at SPEED 345MISO J2586StorageIn study · proposed 2025-04200 MW[5]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    Feb 1, 2024[1]
  5. First operational
    Jun 4, 2026[1]
  6. Expected completion
    —
Buildings (planned)
2[1]Likelyderived

Count of building outlines traced on satellite imagery.

Buildings operational
2[1]Likelyestimated
PhaseStatusAdded MWCompleted / expectedSource
Buildings 1–2operational241 MWJun 4, 2026[1]

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Capital cost / investment
$6.7B[1]Likelyestimated

Modeled total capital cost (2025 USD) of capacity currently operational, incl. compute hardware.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

Compute

Chip types
B300[1]Confirmed
Compute (H100-equivalents)
203,100[1]Likelyestimated

What changed (last 3 years)

Follow this facility (RSS)
  • Buildings operational
    0Feb 1, 2024[1]→2Jun 4, 2026[1]
  • Status
    Under constructionFeb 1, 2024[1]→OperatingJun 4, 2026[1]

Timeline

Construction start: Feb 1, 2024[1]
First operational: Jun 4, 2026[1]
  1. Feb 1, 2024[1]

    Land clearing begins.

  2. Mar 6, 2026[1]

    Building 1 and 2 shell and cooling look complete, but there's still construction activity. We give it another 3 months to operational.

  3. Jun 4, 2026241 MW facility power· 2 buildings operational[1]

    Building 1 and 2 are operational.

All claims (provenance audit)

27
FieldValueSourceConfidenceAs ofStatus
NameMeta Jeffersonville[1] Likely2026-06-04Shown
StatusUnder construction[1] derivedLikely2024-02-01Superseded / alternative
StatusUnder construction[1] derivedLikely2026-03-06Superseded / alternative
StatusOperating[1] derivedLikely2026-06-04Shown
Facility typeAI campus[1] derivedLikely2026-06-04Shown
Address500 8th St, Jeffersonville, IN 47130, USA[1] Likely2026-06-04Shown
OwnerMetaOwner: Meta[1] Confirmed2026-06-04Shown
End usersMetaUsers: Meta[1] Confirmed2026-06-04Shown
UtilityDuke Energyterritory 15470: DUKE ENERGY INDIANA, LLC (INVESTOR OWNED, DUKE ENERGY CORP)[2] derivedUnverified2022Shown
Current facility power241 MW[1] estimatedLikely2026-06-04Shown
Current IT capacity178 MW[1] estimatedLikely2026-06-04Shown
Estimated annual consumption1,478 GWh/yr[3] estimatedSpeculative2026-09-29Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC..[4] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Generation queued in county400 MW[5] derivedConfirmed2026-09-27Shown
State avg. industrial price9.16¢/kWh[6] Confirmed2026-07Shown
State avg. commercial price13.30¢/kWh[6] Confirmed2026-07Shown
Generation within 50 km6 GW[7] derivedConfirmed202502Shown
Buildings (planned)2[1] derivedLikely2026-06-04Shown
Buildings operational2[1] estimatedLikely2026-06-04Shown
Buildings operational0[1] estimatedLikely2024-02-01Superseded / alternative
Buildings operational0[1] estimatedLikely2026-03-06Superseded / alternative
Capital cost / investment$6.7B[1] estimatedLikely2026-06-04Shown
Compute (H100-equivalents)203,100[1] estimatedLikely2026-06-04Shown
Chip typesB300[1] Confirmed2026-06-04Shown
Construction startFeb 1, 2024[1] derivedLikely2026-06-04Shown
First operationalJun 4, 2026[1] derivedLikely2026-06-04Shown