POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMicrosoft
- →substationMidAmerican Energy substation (161 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.31 km away. Proximity does not establish that it serves the site.
- →transmission161 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.34 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.53392, -93.86344
- County
- Dallas County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Iowa statewide average, July 2026.
- State avg. commercial price
Iowa statewide average, July 2026.
- Generation within 50 km
19 EIA-reported plants within 50 km.
- Generation queued in county
1 active generation interconnection requests in Dallas County: Wind 200 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 161 kV line · MidAmerican Energy | Transmission line | 0.34 km | 161 kV | [1] |
| River Hills · MidAmerican Energy Co | Power plant (Natural Gas) | 21.2 km | 113 MW | [6] |
| Sycamore (Ia) · MidAmerican Energy Co | Power plant (Natural Gas) | 21.8 km | 141 MW | [6] |
| Greater Des Moines · MidAmerican Energy Co | Power plant (Natural Gas) | 28 km | 504 MW | [6] |
| Pleasant Hill · MidAmerican Energy Co | Power plant (Natural Gas) | 28.4 km | 154 MW | [6] |
| Indianola · Indianola Municipal Utilities | Power plant (Petroleum) | 31.7 km | 42 MW | [6] |
| Arbor Hill Solar · MidAmerican Energy Co | Power plant (Solar) | 34.1 km | 24 MW | [6] |
| Arbor Hill Wind Farm · MidAmerican Energy Co | Power plant (Wind) | 36.2 km | 310 MW | [6] |
| Macksburg Wind Project · MidAmerican Energy Co | Power plant (Wind) | 41.3 km | 120 MW | [6] |
| MidAmerican Energy substation · MidAmerican Energy | Substation | 0.31 km | 161 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J3655 at OVERLAND TRAIL - FALLOW AVENUE 345.0kVMISO J3655 | Wind | In study · proposed 2028-04 | 200 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
3All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Microsoftway/1375475071 name=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Hyperscale | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Microsoftoperator=Microsoft | [1] | Likely | 2026-09-27 | Shown |
| Utility | MidAmerican Energyterritory 12341: MIDAMERICAN ENERGY CO (INVESTOR OWNED, BERKSHIRE HATHAWAY ENERG | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | MidAmerican Energy substation (161 kV)way/1159798613 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 161 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 200 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.99¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.27¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.47 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 250,700 sq ft | [1] derived | Likely | 2026-09-27 | Shown |