Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityMiddletown Data Center
- →substationUnnamed substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 2.21 km away. Proximity does not establish that it serves the site.
- →transmission34.5 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
- →utilityRappahannock Electric Coop[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 39.01760, -78.29096
- Address
- County
- Frederick County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Virginia statewide average, July 2026.
- State avg. commercial price
Virginia statewide average, July 2026.
- Generation within 50 km
13 EIA-reported plants within 50 km.
- Generation queued in county
12 active generation interconnection requests in Frederick County: Solar 730 MW, Storage 360 MW, Solar + storage 190 MW, Gas 14 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 34.5 kV line | Transmission line | 0.23 km | 34.5 kV | [1] |
| Foxglove Solar · Urban Grid Solar | Power plant (Solar) | 6.3 km | 75 MW | [6] |
| Bartonsville Energy Facility, LLC · Bartonsville Energy Facility, LLC | Power plant (Solar) | 9.1 km | 130 MW | [6] |
| Warren County · Virginia Electric & Power Co | Power plant (Natural Gas) | 11.1 km | 1.37 GW | [6] |
| Hecate Energy Clarke County LLC · Dominion Renewable Energy | Power plant (Solar) | 14.2 km | 10 MW | [6] |
| Hp Hood Ct · HP Hood LLC | Power plant (Natural Gas) | 15.6 km | 15 MW | [6] |
| Capon Bridge Solar LLC · Capon Bridge Solar LLC | Power plant (Solar) | 42.6 km | 20 MW | [6] |
| Mt. Jackson Solar · Energix Mt. Jackson, LLC. | Power plant (Solar) | 44.5 km | 16 MW | [6] |
| Blake Solar Plant · Horus West Virginia 1, LLC | Power plant (Solar) | 48 km | 80 MW | [6] |
| Unnamed substation | Substation | 2.21 km | 34.5 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Bartonsville-Meadowbrook 138 kVPJM AH1-001 | Solar | In study · proposed 2023-12 | 220 MW | [4] |
| Doubs-Bismark 500 kVPJM AG2-182 | Solar | In study · proposed 2022-12 | 200 MW | [4] |
| Stonewall 138 kVPJM AG2-288 | Storage | In study · proposed 2023-12 | 150 MW | [4] |
| Bartonsville Energy FacilityPJM AF2-075 | Solar | Under construction · proposed 2024-07 | 130 MW | [4] |
| Greenwood 138 kVPJM AI1-184 | Storage | In study · proposed 2027-12 | 110 MW | [4] |
| Meadow Brook 138 kVPJM AG2-300 | Storage | In study · proposed 2023-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Site area
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Middletown Data Centerway/840582927 name=Middletown Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.middletowndatacenter.com/ | [1] | Likely | 2026-09-27 | Shown |
| Address | 8209 Valley Pike, Middletown, VA | [1] | Likely | 2026-09-27 | Shown |
| Utility | Rappahannock Electric Coopterritory 40228: RAPPAHANNOCK ELECTRIC COOP (COOPERATIVE, RAPPAHANNOCK ELECTRIC | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (34.5 kV)node/11407063329 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 2.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 34.5 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.29 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 11.68¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.73 GW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 6.3 acres | [1] derived | Likely | 2026-09-27 | Shown |