DC
/

Middletown Data Center

OperatingUnclassifiedBuildingMiddletown, Frederick County, Virginia
20% profile completeness
15 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Rappahannock Electric Coop · PJM
Substation: Unnamed substation (34.5 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Middletown Data Center
  2. substation
    Unnamed substation (34.5 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 2.21 km away. Proximity does not establish that it serves the site.
  3. transmission
    34.5 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.23 km away). Not confirmed as the supply path.
  4. utility
    Rappahannock Electric Coop[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.01760, -78.29096
Address
8209 Valley Pike, Middletown, VA[1]Likely
County
Frederick County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (34.5 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
2.2 km[1]Likelyderived
Highest-voltage line nearby
34.5 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.07¢/kWh[5]Confirmed

Virginia statewide average, July 2026.

State avg. commercial price
11.68¢/kWh[5]Confirmed

Virginia statewide average, July 2026.

Generation within 50 km
1.73 GW[6]Confirmedderived

13 EIA-reported plants within 50 km.

Generation queued in county
1.29 GW[4]Confirmedderived

12 active generation interconnection requests in Frederick County: Solar 730 MW, Storage 360 MW, Solar + storage 190 MW, Gas 14 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
34.5 kV lineTransmission line0.23 km34.5 kV[1]
Foxglove Solar · Urban Grid SolarPower plant (Solar)6.3 km75 MW[6]
Bartonsville Energy Facility, LLC · Bartonsville Energy Facility, LLCPower plant (Solar)9.1 km130 MW[6]
Warren County · Virginia Electric & Power CoPower plant (Natural Gas)11.1 km1.37 GW[6]
Hecate Energy Clarke County LLC · Dominion Renewable EnergyPower plant (Solar)14.2 km10 MW[6]
Hp Hood Ct · HP Hood LLCPower plant (Natural Gas)15.6 km15 MW[6]
Capon Bridge Solar LLC · Capon Bridge Solar LLCPower plant (Solar)42.6 km20 MW[6]
Mt. Jackson Solar · Energix Mt. Jackson, LLC.Power plant (Solar)44.5 km16 MW[6]
Blake Solar Plant · Horus West Virginia 1, LLCPower plant (Solar)48 km80 MW[6]
Unnamed substationSubstation2.21 km34.5 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Bartonsville-Meadowbrook 138 kVPJM AH1-001SolarIn study · proposed 2023-12220 MW[4]
Doubs-Bismark 500 kVPJM AG2-182SolarIn study · proposed 2022-12200 MW[4]
Stonewall 138 kVPJM AG2-288StorageIn study · proposed 2023-12150 MW[4]
Bartonsville Energy FacilityPJM AF2-075SolarUnder construction · proposed 2024-07130 MW[4]
Greenwood 138 kVPJM AI1-184StorageIn study · proposed 2027-12110 MW[4]
Meadow Brook 138 kVPJM AG2-300StorageIn study · proposed 2023-12100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
6.3 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

15
FieldValueSourceConfidenceAs ofStatus
NameMiddletown Data Centerway/840582927 name=Middletown Data Center[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Websitehttps://www.middletowndatacenter.com/[1] Likely2026-09-27Shown
Address8209 Valley Pike, Middletown, VA[1] Likely2026-09-27Shown
UtilityRappahannock Electric Coopterritory 40228: RAPPAHANNOCK ELECTRIC COOP (COOPERATIVE, RAPPAHANNOCK ELECTRIC [2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (34.5 kV)node/11407063329[1] derivedLikely2026-09-28Shown
Distance to substation2.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby34.5 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.29 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price10.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price11.68¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.73 GW[6] derivedConfirmed202502Shown
Site area6.3 acres[1] derivedLikely2026-09-27Shown