Netrality Data Centers
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNetrality Data Centers
- →substationPoplar Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.63 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.64 km away). Not confirmed as the supply path.
- →utilityUnion Electric CO - (Mo)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Southwestern Bell Telephone (Petroleum, 17 MW) is 0.4 km away[5]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityUnknown typeCo-located17 MWUnverified
Location & imagery
Mapped outline- Coordinates
- 38.62927, -90.19717
- Address
- County
- St. Louis
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: City of Kirkwood - (Mo).
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Missouri statewide average, July 2026.
- State avg. commercial price
Missouri statewide average, July 2026.
- Generation within 50 km
23 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.64 km | 138 kV | [1] |
| Southwestern Bell Telephone · AT&T | Power plant (Petroleum) | 0.4 km | 17 MW | [5] |
| Trigen St. Louis · Ashley Energy LLC | Power plant (Natural Gas) | 1.6 km | 33 MW | [5] |
| Anheuser-Busch St Louis · Anheuser-Busch Inc | Power plant (Natural Gas) | 3.7 km | 26 MW | [5] |
| Venice · Union Electric Co - (MO) | Power plant (Natural Gas) | 4.3 km | 486 MW | [5] |
| Granite City Works · United States Steel Granite City Works | Power plant (Other) | 9.6 km | 78 MW | [5] |
| Sioux · Union Electric Co - (MO) | Power plant (Coal) | 32.8 km | 974 MW | [5] |
| Waterloo · City of Waterloo - (IL) | Power plant (Petroleum) | 32.9 km | 28 MW | [5] |
| Freeburg · Village of Freeburg - (IL) | Power plant (Petroleum) | 33.4 km | 16 MW | [5] |
| Poplar Substation · Ameren Missouri | Substation | 0.63 km | 138 kV | [1] |
| Unnamed substation | Substation | 1.05 km | — | [1] |
| MLK Substation · Ameren Missouri | Substation | 1.13 km | — | [1] |
| South Broadway Substation · Ameren Missouri | Substation | 1.25 km | 138 kV | [1] |
| North Broadway Substation · Ameren Missouri | Substation | 1.3 km | 138 kV | [1] |
| Ameren Substation · Ameren Missouri | Substation | 1.4 km | — | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
15| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Netrality Data Centersway/42323063 name=Netrality Data Centers | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 210 North Tucker Boulevard, Saint Louis, MO 63101 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Union Electric CO - (Mo)territory 19436: UNION ELECTRIC CO - (MO) (INVESTOR OWNED, AMEREN CORP) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Poplar Substation (138 kV)way/1298591030 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.6 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 9.87¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 12.64¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.72 GW | [5] derived | Confirmed | 202502 | Shown |
| Floor area | 415,800 sq ft | [1] estimated | Unverified | 2026-09-27 | Shown |
| Building footprint | 23,100 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| Floors | 18building:levels=18 | [1] | Likely | 2026-09-27 | Shown |