DC
/

Missouri

Facilities
17
1 campuses
Power online
126 MW
1 sites reporting
Under construction
0 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
126 MW online · 0 MW pipeline
AI compute
0.20M
H100-equivalents (est.)
Capital (reported + est.)
$4B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 9.87¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW50 MW100 MW150 MW200 MW202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

No dated pipeline yet.

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced—
  • Interconnection requests—
  • Contracted / approved—
  • Under construction—
  • Operational126 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 1Unverified: 16

Interconnection queues

Active requests to connect to the grid (MISO, SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection21.44 GW · 97 requests
Solar 5.89 GWStorage 5.72 GWGas 4.6 GWUnknown 2.26 GWHybrid 1.8 GWWind 700 MWSolar + storage 325 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Kansas City11126 MW—

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

None identified.

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • SPP126 MW + 0 MW · 9 sites
  • MISO— · 8 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Google Kansas City EastOperating126 MW—

Facilities by status

  • Operating17