DC
/

Newrays Two LLC Mining

OperatingUnclassifiedBuildingHenry County, Tennessee
10% profile completeness
12 claims from 5 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
City of Paris - (Tn) · None (non-RTO region)
Substation: Paris Board of Public Utilities substation (69 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Newrays Two LLC Mining
  2. substation
    Paris Board of Public Utilities substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.3 km away. Proximity does not establish that it serves the site.
  3. transmission
    69 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.2 km away). Not confirmed as the supply path.
  4. utility
    City of Paris - (Tn)[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    None (non-RTO region)[3]
    Service territoryLikely
    Balancing authority: TVA
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
36.32703, -88.32007
County
Henry County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
None (non-RTO region)[3]Likelyderived

Outside all ISO/RTO footprints; balancing authority shown separately.

Balancing authority
TVA[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Paris Board of Public Utilities substation (69 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.3 km[1]Likelyderived
Highest-voltage line nearby
69 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.13¢/kWh[4]Confirmed

Tennessee statewide average, July 2026.

State avg. commercial price
13.43¢/kWh[4]Confirmed

Tennessee statewide average, July 2026.

Generation within 50 km
1.42 GW[5]Confirmedderived

4 EIA-reported plants within 50 km.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
69 kV line · Paris Board of Public UtilitiesTransmission line0.2 km69 kV[1]
Sr Paris · SR Paris, LLCPower plant (Solar)13.2 km7 MW[5]
Gleason Generating Facility · Tennessee Valley AuthorityPower plant (Natural Gas)27.7 km360 MW[5]
West Camden · WM Renewable Energy LLCPower plant (Biomass)33.9 km5 MW[5]
Johnsonville · Tennessee Valley AuthorityPower plant (Natural Gas)44.8 km1.05 GW[5]
Paris Board of Public Utilities substation · Paris Board of Public UtilitiesSubstation0.3 km69 kV[1]
Paris District Substation · Paris Board of Public UtilitiesSubstation2.45 km69 kV[1]
India Substation · Paris Board of Public UtilitiesSubstation2.77 km69 kV[1]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
2 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
NameNewrays Two LLC Miningway/1459680304 name=Newrays Two LLC Mining[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityCity of Paris - (Tn)territory 14455: CITY OF PARIS - (TN) (MUNICIPAL, CITY OF PARIS - (TN))[2] derivedLikely2022Shown
ISO / RTONone (non-RTO region)[3] derivedLikely—Shown
Balancing authorityTVA[2] derivedLikely—Shown
Nearest mapped substationParis Board of Public Utilities substation (69 kV)way/1208246646[1] derivedLikely2026-09-28Shown
Distance to substation0.3 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby69 kV[1] derivedLikely2026-09-28Shown
State avg. industrial price7.13¢/kWh[4] Confirmed2026-07Shown
State avg. commercial price13.43¢/kWh[4] Confirmed2026-07Shown
Generation within 50 km1.42 GW[5] derivedConfirmed202502Shown
Site area2 acres[1] derivedLikely2026-09-27Shown