DC
/

Tennessee

Facilities
31
3 campuses
Power online
1.82 GW
3 sites reporting
Under construction
789 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
5
1.82 GW online · 789 MW pipeline
AI compute
1.49M
H100-equivalents (est.)
Capital (reported + est.)
$52B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 7.13¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW750 MW1.5 GW2.25 GW3 GW20252026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced2.51 GW
  • Interconnection requests—
  • Contracted / approved—
  • Under construction789 MW
  • Operational1.82 GW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 3Unverified: 28

Interconnection queues

Active requests to connect to the grid (PJM). Requests are applications, not commitments — most never get built.

Generation seeking interconnection156 MW · 2 requests
Solar 156 MW

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
Memphis41.7 GW789 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)1.82 GW + 789 MW · 30 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Colossus 2Operating + expanding1.28 GW789 MW
Colossus 1Operating425 MW—
Meta GallatinOperating114 MW—

Facilities by status

  • Operating30
  • Operating + expanding1