North East Data LLC Data Center

PlannedUnclassifiedSiteNiagara County, New York
10% profile completeness
7 claims from 1 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H1 2028 – H1 2032
Medium confidencewindow, not a prediction
Project verification
Documented development
System impact study documented by ISO/RTO queue.
Current stage
System impact study
Furthest stage with documented evidence
Utility · ISO
NM-NG · NYISO
Substation: 230kV lines 77 and 78

Power reality

Announced
No record
Interconnection request
500 MW[1]
1 active load interconnection request(s): NYISO 1741
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: System impact study (furthest stage with documented evidence)[1]
  • Stated date: Requested in-service date (NYISO 1741): 2029-12[1]
  • Required: 500 MW
Assumptions
  • From “System impact study”, large loads have typically taken 1.5–3.5 more years to first power (editorial range; see Methodology).
  • Stated dates slip; the window allows up to 2 years past the stated date at this stage.
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H1 2028 – H1 2032

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection applicationAug 29, 2025
    ISO/RTO queue
    • Aug 29, 2025 · NYISO load request 1741 (500 MW): Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029[1]
    • Sep 27, 2026 · Load interconnection request: 500 MW[1]
  2. Feasibility study
    ISO/RTO queue
    • NYISO load request 1741 (500 MW): Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029 (queue status as of 2026-09-27)[1]
  3. System impact study
    ISO/RTO queue
    • NYISO load request 1741 (500 MW): Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029 (queue status as of 2026-09-27)[1]
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: ISO/RTO queue.

Grid path

  1. facility
    North East Data LLC Data Center
  2. substation
    230kV lines 77 and 78[1]
    Queue POIConfirmed
    Point of interconnection in NYISO load request 1741
  3. transmission
    230 kV[1]
    Queue POILikely
    Voltage at the requested point of interconnection (230kV lines 77 and 78)
  4. utility
    NM-NG[1]
    Queue POILikely
    Transmission owner on the interconnection request
  5. ISO / RTO
    NYISO[1]
    Service territoryConfirmed
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
NYISO 1741
North East Data LLC Data Center · North East Data LLC
This site's load request
Confirmed
Site record created from this queue entry.
System impact study
Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029
500—Aug 29, 2025Dec 2029230kV lines 77 and 78
TO: NM-NG
[1] Sep 27, 2026

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
43.20113, -78.74460
County
Niagara County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

Interconnection customer on the load request.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
NYISO[1]Confirmed

The request is in this ISO's queue.

Interconnection status
NYISO load request 1741: 500 MW, in study at 230kV lines 77 and 78[1]Confirmed
Load interconnection request
500 MW[1]Confirmed

NYISO load interconnection request 1741 (Data center).

Contracted / committed power
Not yet sourced

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    Aug 29, 2025[1]
  4. Construction start
    —
  5. First operational
    Dec 2029[1]
    Projected
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Aug 29, 2025[1]

    NYISO load interconnection request 1741 filed (500 MW).

  2. Dec 2029Projected[1]

    Proposed initial backfeed / in-service for NYISO load request 1741.

All claims (provenance audit)

7
FieldValueSourceConfidenceAs ofStatus
NameNorth East Data LLC Data Center[1] Confirmed2026-09-27Shown
StatusPlanned[1] derivedConfirmed2026-09-27Shown
Facility typeUnclassified[1] derivedConfirmed2026-09-27Shown
DeveloperNorth East Data LLC[1] Likely2026-09-27Shown
ISO / RTONYISO[1] Confirmed2026-09-27Shown
Interconnection statusNYISO load request 1741: 500 MW, in study at 230kV lines 77 and 78Status 4 (SRIS/SIS pending); proposed initial backfeed: 12-2029 · requested 2025[1] Confirmed2026-09-27Shown
Load interconnection request500 MW[1] Confirmed2026-09-27Shown