DC
/

New York

Facilities
69
2 campuses
Power online
107 MW
2 sites reporting
Under construction
392 MW
planned MW at active sites
Planned
—
30 planned sites (MW not disclosed)
AI campuses
2
107 MW online · 392 MW pipeline
AI compute
0.13M
H100-equivalents (est.)
Capital (reported + est.)
$3.8B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.81¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW125 MW250 MW375 MW500 MW2026202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2026
2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced441 MW
  • Interconnection requests10.62 GW
  • Contracted / approved1.04 GW
  • Under construction392 MW
  • Operational107 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented

No large gaps in this scope.

Verified operating: 2Grid-backed: 3Documented development: 28Unverified: 36

Interconnection queues

Active requests to connect to the grid (NYISO). Requests are applications, not commitments — most never get built.

Generation seeking interconnection10.31 GW · 86 requests
Solar 4.94 GWOther 2.52 GWStorage 1.78 GWWind 1.07 GW

11.11 GW of data-center load across 37 project-level load requests (NYISO publishes these individually; most ISOs don't).

Markets

Click through to drill down

Online Under construction + planned
NameFacilitiesOnlinePipeline
New York / New Jersey14——

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned
  • Anthropic49 MW + 392 MW · 1 sites
  • G4258 MW + 0 MW · 1 sites

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • NYISO107 MW + 392 MW · 69 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Anthropic Lake MarinerOperating + expanding49 MW392 MW
Core42 Lake MarinerOperating58 MW—

Facilities by status

  • Operating38
  • Operating + expanding1
  • Planned30