POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNTT Chicago CH4
- →substationCommonwealth Edison substation[1]Proximity onlyUnverifiedNearest mapped substation, 0.25 km away. Proximity does not establish that it serves the site.
- →transmissionDes Plaines - Itasca 345 kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.87 km away). Not confirmed as the supply path.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.98910, -88.00454
- Address
- County
- DuPage County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
52 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Des Plaines - Itasca 345 kV · Commonwealth Edison | Transmission line | 0.87 km | 345 kV | [1] |
| Des Plaines - Lombard 345 kV & Tonne - Itasca 138 kV · Commonwealth Edison | Transmission line | 0.9 km | 345 kV | [1] |
| 345 kV line · Commonwealth Edison | Transmission line | 0.9 km | 345 kV | [1] |
| 138 kV line | Transmission line | 1.14 km | 138 kV | [1] |
| Itasca - Lombard 345 kV · Commonwealth Edison | Transmission line | 1.22 km | 345 kV | [1] |
| Des Plaines - Lombard 345 kV & Itasca - Lombard 138 kV · Commonwealth Edison | Transmission line | 1.69 km | 345 kV | [1] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 19.9 km | 489 MW | [5] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 22.6 km | 336 MW | [5] |
| Winnetka · Village of Winnetka - (IL) | Power plant (Natural Gas) | 26.6 km | 33 MW | [5] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 26.7 km | 991 MW | [5] |
| Ingredion Incorporated · Ingredion Inc - Illinois | Power plant (Natural Gas) | 27.9 km | 51 MW | [5] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 32.1 km | 56 MW | [5] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 32.9 km | 197 MW | [5] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 46.6 km | 108 MW | [5] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 0.25 km | — | [1] |
| ComEd Itasca 138kV-345kV Substation · Commonwealth Edison | Substation | 1.26 km | 345 kV | [1] |
| Tonne 138kV Substation · Commonwealth Edison | Substation | 2.35 km | 138 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
Other buildings on this campus
3- NTT Chicago CH1Operating · 113,600 sq ft footprint
- NTT Chicago CH2Operating · 115,600 sq ft footprint
- NTT Chicago CH3Operating · 84,000 sq ft footprint
All claims (provenance audit)
16| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | NTT Chicago CH4way/1446350370 name=NTT Chicago CH4 | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://services.global.ntt/en-us/services-and-products/global-data-centers/global-locations/americas/chicago-ch1-data-center | [1] | Likely | 2026-09-27 | Shown |
| Address | 1200 Arlington Heights Road, Itasca, IL 60143 | [1] | Likely | 2026-09-27 | Shown |
| Operator | NTT Global Data Centersoperator=NTT | [1] | Likely | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Commonwealth Edison substationway/1537710030 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 11.87¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.46 GW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 101,400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |