NYGC Chateaugay
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityNYGC Chateaugay
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionWillis - Plattsburgh 230kV #2[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.13 km away). Not confirmed as the supply path.
- →utilityNiagara Mohawk Power Corp.[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 44.89283, -74.07243
- County
- Franklin County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: New York State Elec & Gas Corp.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New York statewide average, July 2026.
- State avg. commercial price
New York statewide average, July 2026.
- Generation within 50 km
32 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Franklin County: Solar 350 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Willis - Plattsburgh 230kV #2 · New York Power Authority | Transmission line | 0.13 km | 230 kV | [1] |
| Willis - Plattsburgh 230kV #1 · New York Power Authority | Transmission line | 0.16 km | 230 kV | [1] |
| Jericho Rise Wind Farm LLC · Jericho Rise Wind Farm LLC | Power plant (Wind) | 2.5 km | 78 MW | [6] |
| Chateaugay · Valcour Operating Services, LLC | Power plant (Wind) | 3.4 km | 107 MW | [6] |
| Willis Battery Storage · New York Power Authority | Power plant (Batteries) | 3.7 km | 20 MW | [6] |
| Clinton · Valcour Operating Services, LLC | Power plant (Wind) | 5.2 km | 101 MW | [6] |
| Ellenburg · Valcour Operating Services, LLC | Power plant (Wind) | 5.2 km | 81 MW | [6] |
| Marble River Wind Farm · Marble River, LLC | Power plant (Wind) | 14.5 km | 215 MW | [6] |
| Altona · Valcour Operating Services, LLC | Power plant (Wind) | 34.2 km | 98 MW | [6] |
| High Falls - Saranac Ny · New York State Elec & Gas Corp | Power plant (Hydroelectric) | 38.1 km | 15 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| NY125A - Fort Covington SolarNYISO 1183 · Fort Covington Solar LLC | Solar | IA signed · proposed 2028-07 | 250 MW | [4] |
| Brookside SolarNYISO 0880 · Brookside Solar, LLC | Solar | IA signed · proposed 2027-12 | 100 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
- $595.9M[7]Comparable-assessment model · Sep 29, 2026$913/sq ft × 652,652 sq ft (n=32 comps)
- Site area
Area of the mapped OSM site outline.
- Annual property tax
- Not yet sourced
Size
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | NYGC Chateaugayway/1501825871 name=NYGC Chateaugay | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | 2CRSioperator=2CRSi | [1] | Likely | 2026-09-27 | Shown |
| Utility | Niagara Mohawk Power Corp.territory 13573: NIAGARA MOHAWK POWER CORP. (INVESTOR OWNED, NATIONAL GRID GROUP | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | NYISONEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 350 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 799 MW | [6] derived | Confirmed | 202502 | Shown |
| Site area | 15 acres | [1] derived | Likely | 2026-09-27 | Shown |
| Model estimate of property value | $595.9M | [7] estimated | Speculative | 2026-09-29 | Shown |