Old Main
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityOld Main
- →substationLawrence Avenue Station (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.41 km away. Proximity does not establish that it serves the site.
- →transmission5;4 (115 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.9 km away). Not confirmed as the supply path.
- →utilityNiagara Mohawk Power Corp.[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 44.66808, -74.98059
- County
- St. Lawrence County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New York statewide average, July 2026.
- State avg. commercial price
New York statewide average, July 2026.
- Generation within 50 km
51 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in St. Lawrence County: Other 240 MW, Solar 192 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 5;4 · National Grid | Transmission line | 0.9 km | 115 kV | [1] |
| 4 · National Grid | Transmission line | 1.38 km | 115 kV | [1] |
| 5 · National Grid | Transmission line | 1.4 km | 115 kV | [1] |
| Colton · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 9.5 km | 30 MW | [6] |
| Five Falls · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 18.8 km | 22 MW | [6] |
| South Colton · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 18.9 km | 20 MW | [6] |
| Rainbow Falls Hydro · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 20.9 km | 24 MW | [6] |
| Stark · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 29.3 km | 23 MW | [6] |
| Massena Energy Facility · Power City Partners LP | Power plant (Natural Gas) | 32.1 km | 83 MW | [6] |
| Ogdensburg Power · AG Energy LP | Power plant (Natural Gas) | 37 km | 23 MW | [6] |
| Robert Moses Power Dam · New York Power Authority | Power plant (Hydroelectric) | 40 km | 856 MW | [6] |
| Lawrence Avenue Station · National Grid | Substation | 1.41 km | 115 kV | [1] |
| Unnamed substation | Substation | 2.79 km | — | [1] |
| Brookfield Renewable US substation · Brookfield Renewable US | Substation | 2.93 km | 115 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Rich Road Solar Energy CenterNYISO 0800 · Rich Road Solar Energy Center, LLC | Other | In study · proposed 2028-04 | 240 MW | [4] |
| Gateway Solar Energy CenterNYISO 0620 · Gateway Solar Energy Center, LLC | Solar | IA signed · proposed 2028-04 | 180 MW | [4] |
| BR Benson Mines SolarNYISO 1166 · BR Project 1 LLC | Solar | IA signed · proposed 2027-12 | 12 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | Old Mainway/42000820 name=Old Main | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Operator | Clarkson Universityoperator=Clarkson University | [1] | Likely | 2026-09-27 | Shown |
| Utility | Niagara Mohawk Power Corp.territory 13573: NIAGARA MOHAWK POWER CORP. (INVESTOR OWNED, NATIONAL GRID GROUP | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | NYISONEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Lawrence Avenue Station (115 kV)way/110359345 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 432 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.24 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 24,700 sq ft | [1] derived | Likely | 2026-09-27 | Shown |