Prologis San Jose campus

UnknownUnclassifiedCampusSan Jose, Santa Clara County, California
10% profile completeness
9 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
400 MW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2032
Low confidencewindow, not a prediction
Project verification
Announced only
Only announcements or press coverage found.
Current stage
Announced
Furthest stage with documented evidence
Utility · ISO
Pacific Gas and Electric · CAISO
Substation: Not identified

Power reality

Announced
400 MW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 400 MW announced.
  • ⚠ No public interconnection record for this load — CAISO does not publish large-load requests.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Announced (furthest stage with documented evidence)[1]
  • No public grid record: No interconnection request or utility contract found; adds uncertainty to the upper bound.
  • Required: 400 MW
Assumptions
  • From “Announced”, large loads have typically taken 2–5 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2032

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 400 MW[1]
  2. Land acquired
  3. Planning / zoning
  4. Permitting
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Prologis San Jose campus
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Pacific Gas and Electric[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    CAISO[2]
    Service territoryLikely
    Balancing authority: CISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
37.23308, -121.69134
County
Santa Clara County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer
Prologis[1]Confirmed

“Prologis / Data Center and Manufacturing San Jose, CA”

Utility

“Prologis / Data Center and Manufacturing San Jose, CA” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
400 MW[1]Likely

“400MW data center campus planned as part of group of data center projects in San Jose”

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
CAISO[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
CISO[3]Likelyderived

Control area of the containing utility territory.

State avg. industrial price
25.11¢/kWh[5]Confirmed

California statewide average, July 2026.

State avg. commercial price
30.56¢/kWh[5]Confirmed

California statewide average, July 2026.

Generation within 50 km
3.6 GW[6]Confirmedderived

65 EIA-reported plants within 50 km.

Generation queued in county
823 MW[4]Confirmedderived

6 active generation interconnection requests in Santa Clara County: Storage 823 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Metcalf Energy Center · Calpine Corp - Metcalf Energy CenterPower plant (Natural Gas)5 km557 MW[6]
Sc 1 Data Center, Phase 2 · Xeres Ventures LLCPower plant (Petroleum)26.5 km100 MW[6]
Donald Von Raesfeld Power Plant · City of Santa Clara - (CA)Power plant (Natural Gas)28 km148 MW[6]
Gilroy Power Plant · Calpine Gilroy Cogen LPPower plant (Natural Gas)29.3 km101 MW[6]
Gilroy Peaking Energy Center · Calpine Gilroy Cogen LPPower plant (Natural Gas)29.4 km144 MW[6]
Los Esteros Critical Energy Center · Los Esteros Critical Energy Facility LLCPower plant (Natural Gas)30.1 km300 MW[6]
Elkhorn Battery Energy Storage System · Pacific Gas & Electric Co.Power plant (Batteries)47.9 km183 MW[6]
Dynegy Moss Landing Power Plant Hybrid · Dynegy -Moss Landing LLCPower plant (Natural Gas)48.3 km1.77 GW[6]
Largest queued generation in this countyFuelQueue statusMWSource
JEWELFLOWER STORAGECAISO 1553StorageIA signed · proposed 2029-03350 MW[4]
TANAGER STORAGECAISO 1550StorageIA signed · proposed 2027-12200 MW[4]
LOS ESTEROS CRITICAL ENERGY FACILITY EXPANSIONCAISO 378StorageIA signed · proposed 2023-09120 MW[4]
TOKAY STORAGECAISO 1866StorageIA signed · proposed 2030-03100 MW[4]
KIFER BESS 1CAISO 1918StorageIn study · proposed 2025-1250 MW[4]
MILPA POWER BANKCAISO 1457StorageIn study · proposed 2025-043 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
400 MW[1]Likely

“400MW data center campus planned as part of group of data center projects in San Jose”

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
DeveloperPrologis[1] Confirmed2026-09-11Shown
UtilityPacific Gas and Electric[1] Confirmed2026-09-11Shown
Planned capacity400 MW[1] Likely2026-09-11Shown
ISO / RTOCAISOCALIFORNIA INDEPENDENT SYSTEM OPERATOR[2] derivedLikely—Shown
Balancing authorityCISO[3] derivedLikely—Shown
Generation queued in county823 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price25.11¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price30.56¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.6 GW[6] derivedConfirmed202502Shown