Linked facilities
3
States
2
Reported power online
—
Reported planned capacity
400 MW
Power totals sum only facilities with a reported or estimated figure, across all roles (a company can be tenant at one site and owner at another).
Loading map…
US footprint by state
- Virginia2 sites
- California1 sites
Relationship graph
Derived from the ownership → operation → tenancy → workload chain at each shared facility, plus company-to-company relationships extracted from cited documents. Speculative links are excluded.
Owns property used by
- Amazon Web Services2 sites · LikelyAmazon IAD-51, Amazon IAD-56
| Facility | Role | Location | Status | Power |
|---|---|---|---|---|
| Prologis San Jose campus | Developer | San Jose, CA | Unknown | 400 MW planned |
| Amazon IAD-51 | Property owner of record | Sterling, VA | Operating | — |
| Amazon IAD-56 | Property owner of record | Sterling, VA | Operating | — |