QTS Cedar Rapids
QTS Cedar Rapids is an under construction ai campus in Fairfax, Iowa. Planned capacity: 1.59 GW (estimated). Verification: under construction. 11 cited sources.
Follow
Get changes to QTS Cedar Rapids
Or subscribe in a feed reader: RSS / Atom
Cite this
Datacenter Source. “QTS Cedar Rapids.” /facilities/qts-cedar-rapids-fairfax-ia. Data as of 2026-11-09. Accessed 2026-11-09.
@misc{datacentersource_qts_cedar_rapids_fairfax_ia_2026,
title = {{QTS Cedar Rapids}},
author = {{Datacenter Source}},
year = {2026},
howpublished = {\url{/facilities/qts-cedar-rapids-fairfax-ia}},
note = {Data as of 2026-11-09; accessed 2026-11-09. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}Please also cite the original source of any specific figure (linked beside it).
POWER & GRID
Time-to-power · verification · interconnectionPower reality
- ⚠ No public interconnection record for this load — MISO does not publish large-load requests.
- ⚠ No permit record linked to this site yet.
How the time-to-power window was estimated
- From “Under construction”, large loads have typically taken 0.5–2 more years to first power (editorial range; see Methodology).
- Construction to first power typically takes 1.25–2.5 years.
- The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Model estimate, Satellite imagery.
Grid path
- →facilityQTS Cedar Rapids
- →substationOn-site substation[1]Satellite imageryLikely2 substation outlines traced inside the campus on satellite imagery
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
LOCAL IMPACT
Water · generation · incentives · regulation · ratesWater & cooling1
- Air-cooled (chillers / dry coolers)[1]EstimatedModeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Oct 23, 2026cooling
“Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared.”
Named in Epoch AI's satellite-imagery notes for this date.
On-site generation & air permits
Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source
Incentives
Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source
Regulatory events
Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source
Utility & rates
Not yet collected: we haven't found a source for a large-load tariff or commission docket for Alliant Energy. Know one? Add a source
Location & imagery
Mapped outline- Coordinates
- 41.90931, -91.74194
- Address
- 6200 76th Ave SW, Fairfax, IA 52228[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Likely
- County
- Linn County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developer
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workload
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
Power (all fields)
- Planned capacity
- 1.59 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2027-11-15); not necessarily full build-out.
- Current facility power
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
- MISO[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Location falls inside this ISO/RTO footprint.
- Balancing authority
- MISO[3]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure.Likelyderived
Control area of the containing utility territory.
- State avg. industrial price
- 9.31¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed
Iowa statewide average, August 2026.
- State avg. commercial price
- 14.15¢/kWh[5]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Aug 2026.Confirmed
Iowa statewide average, August 2026.
- Generation within 50 km
- 1.11 GW[6]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived
22 EIA-reported plants within 50 km.
- Generation queued in county
- 2.61 GW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Nov 9, 2026.Confirmedderived
12 active generation interconnection requests in Linn County: Nuclear 1,261 MW, Solar 660 MW, Storage 595 MW, Gas 95 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Archer Daniels Midland Cedar Rapids · Archer Daniels Midland Co | Power plant (Coal) | 4.7 km | 295 MW | [6] |
| Prairie Creek · Interstate Power and Light Co | Power plant (Natural Gas) | 9.3 km | 156 MW | [6] |
| Amana Society Service Company · Amana Society Service Co | Power plant (Petroleum) | 17.9 km | 22 MW | [6] |
| Pleasant Creek Unit 2 · Interstate Power and Light Co | Power plant (Solar) | 22 km | 150 MW | [6] |
| Pleasant Creek Unit 1 · Interstate Power and Light Co | Power plant (Solar) | 22 km | 50 MW | [6] |
| Coralville Gt · MidAmerican Energy Co | Power plant (Natural Gas) | 30.2 km | 63 MW | [6] |
| University of Iowa Main Power Plant · University of Iowa | Power plant (Natural Gas) | 32.7 km | 41 MW | [6] |
| Diamond Trail Wind Farm · MidAmerican Energy Co | Power plant (Wind) | 43.7 km | 250 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J3932 at Duane Arnold 161 kVMISO J3932 | Nuclear | In study · proposed 2029-06 | 646 MW | [4] |
| J2268 at Duane ArnoldMISO J2268 | Solar | In study · proposed 2024-10 | 400 MW | [4] |
| J2469 at Sub K (Tiffin)-Duane Arnold 345kVMISO J2469 | Storage | In study · proposed 2027-10 | 300 MW | [4] |
| R5071 at Duane Arnold (ARNOLD 5)MISO R5071 | Nuclear | In study | 251 MW | [4] |
| J1444 at Duane Arnold 345kV SubstationMISO J1444 | Solar | IA signed · proposed 2015-08 | 200 MW | [4] |
| R5069 at Duane Arnold (ARNOLD 5)MISO R5069 | Nuclear | In study | 200 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction startJan 17, 2025[1]
- First operationalDec 1, 2026[1]Projected
- Expected completionNov 15, 2027[1]Projected
- Planned capacity
- 1.59 GW[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Likelyestimated
Projected facility power at the last tracked milestone (2027-11-15); not necessarily full build-out.
- Buildings (planned)
- 7[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Likelyderived
Count of building outlines traced on satellite imagery.
- Buildings operational
- 0[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Likelyestimated
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Floor area
- Not yet sourced
Compute
- Chip types
- B300, Rubin[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 23, 2026.Confirmed
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
- Jan 17, 2025[1]
Land clearing begins for Building 1-3.
- Oct 27, 2025[1]
Building 1 roof complete, with air-cooled chillers in place. Building 2 and 3 roofs are partly completed. Building 4 and 5 have a foundation.
- Apr 16, 2026[1]
Based on satellite imagery, the Buildings 1-3 shells look complete. Buildings 4-6 are far along, with roofs largely in place, while the eastern Building 7 foundation is well underway. No buildings operational yet.
- May 7, 2026[1]
Similar to April, Buildings 1-3 shells look complete. Buildings 4-6 are still far along, and the eastern Building 7 foundation is still underway.
- Oct 23, 2026[1]
Buildings 1–3 look externally complete, with the air-cooled chillers fully installed, and surrounding yard work cleared. The many cars and trucks parked beside the buildings suggest commissioning is still underway, so we’re not counting any buildings operational yet. Buildings 4-6 shells appear complete, and Building 7 is nearly 90% roofed. This is based on high-resolution satellite imagery from this date.
Buildings 1-3 are operational. Based on the visible progress in the October satellite image, and the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that the first phase of the project was expected to be completed in late 2026."
Buildings 4-7 are operational. Based on the expected completion date reported by local news: “A QTS spokesperson said in July [2025] that [...] The second phase is expected to be completed in late 2027."
All claims (provenance audit)
29| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | QTS Cedar Rapids | [1] | Likely | 2026-10-23 | Shown |
| Status | Under construction | [1] derived | Likely | 2025-01-17 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2025-10-27 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-04-16 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-05-07 | Superseded / alternative |
| Status | Under construction | [1] derived | Likely | 2026-10-23 | Shown |
| Facility type | AI campus | [1] derived | Likely | 2026-10-23 | Shown |
| Address | 6200 76th Ave SW, Fairfax, IA 52228 | [1] | Likely | 2026-10-23 | Shown |
| Owner | MetaOwner: Meta | [1] | Speculative | 2026-10-23 | Shown |
| End users | MetaUsers: Meta | [1] | Speculative | 2026-10-23 | Shown |
| Utility | Alliant EnergyEnergy companies: Alliant Energy | [1] | Confirmed | 2026-10-23 | Shown |
| Planned capacity | 1.59 GW | [1] estimated | Likely | 2026-10-23 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [2] derived | Likely | — | Shown |
| Balancing authority | MISO | [3] derived | Likely | — | Shown |
| Generation queued in county | 2.61 GW | [4] derived | Confirmed | 2026-11-09 | Shown |
| State avg. industrial price | 9.31¢/kWh | [5] | Confirmed | 2026-08 | Shown |
| State avg. commercial price | 14.15¢/kWh | [5] | Confirmed | 2026-08 | Shown |
| Generation within 50 km | 1.11 GW | [6] derived | Confirmed | 202502 | Shown |
| Buildings (planned) | 7 | [1] derived | Likely | 2026-10-23 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2026-10-23 | Shown |
| Buildings operational | 0 | [1] estimated | Likely | 2025-01-17 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2025-10-27 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-04-16 | Superseded / alternative |
| Buildings operational | 0 | [1] estimated | Likely | 2026-05-07 | Superseded / alternative |
| Chip types | B300 | [1] | Confirmed | 2026-10-23 | Shown |
| Chip types | Rubin | [1] | Confirmed | 2026-10-23 | Shown |
| Construction start | Jan 17, 2025 | [1] derived | Likely | 2026-10-23 | Shown |
| First operational | Dec 1, 2026 | [1] estimated | Speculative | 2026-10-23 | Shown |
| Expected completion | Nov 15, 2027 | [1] estimated | Speculative | 2026-10-23 | Shown |