QTS Piscataway Data Center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityQTS Piscataway Data Center (NJ1)
- →substationUnnamed substation (69 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.19 km away. Proximity does not establish that it serves the site.
- →transmissionBridgewater to Middlesex 230 kV transmission line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.46 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 40.55669, -74.48399
- Address
- County
- Middlesex County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New Jersey statewide average, July 2026.
- State avg. commercial price
New Jersey statewide average, July 2026.
- Generation within 50 km
281 EIA-reported plants within 50 km.
- Generation queued in county
4 active generation interconnection requests in Middlesex County: Offshore wind 3,920 MW, Storage 90 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Bridgewater to Middlesex 230 kV transmission line · Public Service Enterprise Group | Transmission line | 0.46 km | 230 kV | [1] |
| Middlesex Switch Tap (JCPL) - Greenbrook (PSEG) · Jersey Central Power and Light | Transmission line | 1.79 km | 230 kV | [1] |
| 230 kV line | Transmission line | 1.88 km | 230 kV | [1] |
| Lake Nelson to Middlesex Switch Tap · Jersey Central Power and Light | Transmission line | 1.89 km | 230 kV | [1] |
| Woodbridge Energy Center · Woodbridge Energy Center | Power plant (Natural Gas) | 14.7 km | 727 MW | [6] |
| Red Oak Power LLC · Red Oak Operating Services LLC | Power plant (Natural Gas) | 16.6 km | 776 MW | [6] |
| Linden Cogen Plant · EFS Cogen Holdings I LLC | Power plant (Natural Gas) | 24.2 km | 904 MW | [6] |
| Arthur Kill Generating Station · NRG Arthur Kill Operations Inc | Power plant (Natural Gas) | 24.3 km | 896 MW | [6] |
| Pseg Linden Generating Station · Linden Combined Cycle | Power plant (Natural Gas) | 24.5 km | 1.64 GW | [6] |
| Newark Energy Center · Hartree Partners LP | Power plant (Natural Gas) | 34.5 km | 705 MW | [6] |
| East River · Consolidated Edison Co-NY Inc | Power plant (Natural Gas) | 47 km | 631 MW | [6] |
| Bergen Generating Station · Bergen Generating Station | Power plant (Natural Gas) | 49.8 km | 1.26 GW | [6] |
| Unnamed substation | Substation | 0.19 km | 69 kV | [1] |
| Unnamed substation | Substation | 1.59 km | 26 kV | [1] |
| Middlesex Switch Tap · Public Service Enterprise Group | Substation | 1.9 km | 230 kV | [1] |
| Abandoned Substation | Substation | 2.2 km | — | [1] |
| DRT Substation | Substation | 2.26 km | 69 kV | [1] |
| Barclays Substation | Substation | 2.43 km | 69 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Deans 500 kVPJM AI1-109 | Offshore wind | In study · proposed 2029-12 | 1.31 GW | [4] |
| Werner 230 kVPJM AI1-111 | Offshore wind | In study · proposed 2029-12 | 1.31 GW | [4] |
| Deans 500 kVPJM AG2-055 | Offshore wind | In study · proposed 2027-11 | 1.3 GW | [4] |
| Sand Hills - Brunswick 69 kVPJM AH1-043 | Storage | In study · proposed 2024-05 | 90 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
17| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | QTS Piscataway Data Centerway/362662493 name=QTS Piscataway Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Facility type | Colocation | [1] derived | Unverified | 2026-09-27 | Shown |
| Website | https://www.qtsdatacenters.com/data-centers/piscataway | [1] | Likely | 2026-09-27 | Shown |
| Address | 101 Possumtown Road, Piscataway, NJ 08854 | [1] | Likely | 2026-09-27 | Shown |
| Operator | QTS Data Centersoperator=Quality Technology Services | [1] | Likely | 2026-09-27 | Shown |
| Utility | PSE&Gterritory 15477: PUBLIC SERVICE ELEC & GAS CO (INVESTOR OWNED, PUBLIC SERVICE EN | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (69 kV)way/708564361 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.2 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 230 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 4.01 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 15.63¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 19.17¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 12.21 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 343,800 sq ft | [1] derived | Likely | 2026-09-27 | Shown |