DC
/

Rack59 Data Center

OperatingUnclassifiedSiteOklahoma CIty, Oklahoma County, Oklahoma
20% profile completeness
13 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Oklahoma Gas & Electric CO · SPP
Substation: Unnamed substation (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Rack59 Data Center
  2. substation
    Unnamed substation[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.39 km away. Proximity does not establish that it serves the site.
  3. transmission
    138 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.42 km away). Not confirmed as the supply path.
  4. utility
    Oklahoma Gas & Electric CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    SPP[3]
    Service territoryLikely
    Balancing authority: SWPP
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Street address
Coordinates
35.46720, -97.64975
Address
7725 West Reno Avenue, Unit 385, Oklahoma CIty, OK 73127[1]Likely
County
Oklahoma County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
SPP[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
SWPP[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.4 km[1]Likelyderived
Highest-voltage line nearby
138 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
8.16¢/kWh[5]Confirmed

Oklahoma statewide average, July 2026.

State avg. commercial price
10.32¢/kWh[5]Confirmed

Oklahoma statewide average, July 2026.

Generation within 50 km
4.08 GW[6]Confirmedderived

17 EIA-reported plants within 50 km.

Generation queued in county
2.64 GW[4]Confirmedderived

10 active generation interconnection requests in Oklahoma County: Gas 992 MW, Wind 745 MW, Storage 599 MW, Hybrid 300 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.42 km138 kV[1]
69 kV lineTransmission line1.25 km69 kV[1]
Mustang · Oklahoma Gas & Electric CoPower plant (Natural Gas)2.3 km401 MW[6]
Frontier · Oklahoma Gas & Electric CoPower plant (Natural Gas)2.8 km126 MW[6]
Mcclain Energy Facility · Oklahoma Gas & Electric CoPower plant (Natural Gas)19.6 km487 MW[6]
Spring Creek Energy Center · Evergy Kansas Central, IncPower plant (Natural Gas)30.6 km294 MW[6]
Kingfisher Wind LLC · Kingfisher Wind LLCPower plant (Wind)36.3 km298 MW[6]
Canadian Hills Wind · Canadian Hills Wind LLCPower plant (Wind)38.4 km294 MW[6]
Horseshoe Lake · Oklahoma Gas & Electric CoPower plant (Natural Gas)42.8 km468 MW[6]
Redbud Power Plant · Oklahoma Gas & Electric CoPower plant (Natural Gas)45.3 km1.21 GW[6]
Unnamed substationSubstation0.39 km—[1]
Council SubstationSubstation0.41 km138 kV[1]
West Oaks SubstationSubstation2.05 km138 kV[1]
Unnamed substationSubstation2.28 km69 kV[1]
Unnamed substationSubstation2.3 km—[1]
Mustang SubstationSubstation2.47 km138 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
GEN-2024-299 at AES 5 345 kV SubstationSPP GEN-2024-299GasIn study · proposed 2032-05744 MW[4]
GEN-2024-255 at Spring Creek 345 kV SubstationSPP GEN-2024-255HybridIn study · proposed 2027-12300 MW[4]
GEN-2017-137 at Arcadia 345kVSPP GEN-2017-137WindIA signed · proposed 2030-06295 MW[4]
GEN-2017-134 at Arcadia 345kVSPP GEN-2017-134WindIA signed · proposed 2030-06250 MW[4]
GEN-2024-293 at Muskoge7 345 kV SubstationSPP GEN-2024-293GasIn study · proposed 2033-05248 MW[4]
GEN-2022-155 at Horseshoe Lake 138 kV SubstationSPP GEN-2022-155StorageIA signed · proposed 2029-05200 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

13
FieldValueSourceConfidenceAs ofStatus
NameRack59 Data Centernode/6401035673 name=Rack59 Data Center[1] Likely2026-09-27Shown
StatusOperating[1] derivedUnverified2026-09-27Shown
Address7725 West Reno Avenue, Unit 385, Oklahoma CIty, OK 73127[1] Likely2026-09-27Shown
UtilityOklahoma Gas & Electric COterritory 14063: OKLAHOMA GAS & ELECTRIC CO (INVESTOR OWNED, OG&E ENERGY)[2] derivedLikely2022Shown
ISO / RTOSPPSOUTHWEST POWER POOL[3] derivedLikely—Shown
Balancing authoritySWPP[2] derivedLikely—Shown
Nearest mapped substationUnnamed substationway/1365833091[1] derivedLikely2026-09-28Shown
Distance to substation0.4 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby138 kV[1] derivedLikely2026-09-28Shown
Generation queued in county2.64 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price8.16¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price10.32¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km4.08 GW[6] derivedConfirmed202502Shown