First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2027 – H2 2029
Low confidencewindow, not a prediction
Project verification
Documented development
Facilities study documented by ISO/RTO queue.
Current stage
Facilities study
Furthest stage with documented evidence
Utility · ISO
NM-NG · NYISO
Substation: Dennison 115kV substation

Power reality

Announced
No record
Interconnection request
200 MW[1]
1 active load interconnection request(s): NYISO 1213
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Facilities study (furthest stage with documented evidence)[1]
  • Stated date: Requested in-service date (NYISO 1213): 2025-08[1]
  • Date passed: The stated 2025-08 has passed without a confirmed energization record.[1]
  • Required: 200 MW
Assumptions
  • From “Facilities study”, large loads have typically taken 1–3 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2027 – H2 2029

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection applicationJun 28, 2021
    ISO/RTO queue
    • Jun 28, 2021 · NYISO load request 1213 (200 MW): Status 10 (Accepted cost allocation / IA in progress); studies available: SIS; proposed initial backfeed: 08-2025[1]
    • Sep 27, 2026 · Load interconnection request: 200 MW[1]
  2. Feasibility study
    ISO/RTO queue
    • NYISO load request 1213 (200 MW): Status 10 (Accepted cost allocation / IA in progress); studies available: SIS; proposed initial backfeed: 08-2025 (queue status as of 2026-09-27)[1]
  3. System impact study
    ISO/RTO queue
    • NYISO load request 1213 (200 MW): Status 10 (Accepted cost allocation / IA in progress); studies available: SIS; proposed initial backfeed: 08-2025 (queue status as of 2026-09-27)[1]
  4. Facilities study
    ISO/RTO queue
    • NYISO load request 1213 (200 MW): Status 10 (Accepted cost allocation / IA in progress); studies available: SIS; proposed initial backfeed: 08-2025 (queue status as of 2026-09-27)[1]
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: ISO/RTO queue.

Grid path

  1. facility
    St Lawrence Data and Agricultural Center
  2. substation
    Dennison 115kV substation[1]
    Queue POIConfirmed
    Point of interconnection in NYISO load request 1213
  3. transmission
    115 kV[1]
    Queue POILikely
    Voltage at the requested point of interconnection (Dennison 115kV substation)
  4. utility
    NM-NG[1]
    Queue POILikely
    Transmission owner on the interconnection request
  5. ISO / RTO
    NYISO[1]
    Service territoryConfirmed
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
NYISO 1213
St Lawrence Data and Agricultural Center · ZeroC Data Centers, LLC
This site's load request
Confirmed
Site record created from this queue entry.
Facilities study
Status 10 (Accepted cost allocation / IA in progress); studies available: SIS; proposed initial backfeed: 08-2025
200—Jun 28, 2021Aug 2025Dennison 115kV substation
TO: NM-NG
[1] Sep 27, 2026

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
44.49689, -75.06752
County
St. Lawrence County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer

Interconnection customer on the load request.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
NYISO[1]Confirmed

The request is in this ISO's queue.

Interconnection status
NYISO load request 1213: 200 MW, in study at Dennison 115kV substation[1]Confirmed
Load interconnection request
200 MW[1]Confirmed

NYISO load interconnection request 1213 (Data center (crypto mining)).

Contracted / committed power
Not yet sourced

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    Jun 28, 2021[1]
  4. Construction start
    —
  5. First operational
    Aug 2025[1]
    Projected
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

  1. Jun 28, 2021[1]

    NYISO load interconnection request 1213 filed (200 MW).

  2. Aug 2025Projected[1]

    Proposed initial backfeed / in-service for NYISO load request 1213 (date has passed; not confirmed in service).

All claims (provenance audit)

7
FieldValueSourceConfidenceAs ofStatus
NameSt Lawrence Data and Agricultural Center[1] Confirmed2026-09-27Shown
StatusPlanned[1] derivedConfirmed2026-09-27Shown
Facility typeCrypto / HPC[1] derivedConfirmed2026-09-27Shown
DeveloperZeroC Data Centers, LLC[1] Likely2026-09-27Shown
ISO / RTONYISO[1] Confirmed2026-09-27Shown
Interconnection statusNYISO load request 1213: 200 MW, in study at Dennison 115kV substationStatus 10 (Accepted cost allocation / IA in progress); studies available: SIS; p[1] Confirmed2026-09-27Shown