SU Green Data Center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilitySU Green Data Center
- →substationUnnamed substation (34.5 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.11 km away. Proximity does not establish that it serves the site.
- →transmission15;37 (115 kV)[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.61 km away). Not confirmed as the supply path.
- →utilityNiagara Mohawk Power Corp.[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
- Onondaga County Resource Recovery (Biomass, 30 MW) is 0.8 km away[5]EIA plant within 1.5 km; proximity does not establish that it supplies the facilityUnknown typeCo-located30 MWUnverified
Location & imagery
Mapped outline- Coordinates
- 43.01208, -76.11593
- Address
- County
- Onondaga County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. Operator
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Operator
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
New York statewide average, July 2026.
- State avg. commercial price
New York statewide average, July 2026.
- Generation within 50 km
66 EIA-reported plants within 50 km.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 15;37 · National Grid | Transmission line | 0.61 km | 115 kV | [1] |
| 15 · National Grid | Transmission line | 0.61 km | 115 kV | [1] |
| 37;15 · National Grid | Transmission line | 0.91 km | 115 kV | [1] |
| 18;15 · National Grid | Transmission line | 0.98 km | 115 kV | [1] |
| 18 · National Grid | Transmission line | 0.98 km | 115 kV | [1] |
| 15;18 · National Grid | Transmission line | 1.16 km | 115 kV | [1] |
| Onondaga County Resource Recovery · Covanta Onondega LP | Power plant (Biomass) | 0.8 km | 30 MW | [5] |
| Carr Street Generating Station · Carr Street Generating Sta LP | Power plant (Natural Gas) | 6.1 km | 93 MW | [5] |
| Ch Resources Syracuse · Lakeside Syracuse LLC | Power plant (Natural Gas) | 10.7 km | 86 MW | [5] |
| Cicero Energy Storage 1 LLC · Convergent Energy and Power LP | Power plant (Solar) | 15.2 km | 10 MW | [5] |
| Fenner Wind · CHI Energy Inc | Power plant (Wind) | 28.9 km | 30 MW | [5] |
| Sterling Power Plant · Sterling Power Partners LP | Power plant (Natural Gas) | 42.5 km | 56 MW | [5] |
| Granby · Erie Boulevard Hydropower LP | Power plant (Hydroelectric) | 42.5 km | 10 MW | [5] |
| Munnsville Wind Farm LLC · RWE Renewables Americas, LLC | Power plant (Wind) | 45.9 km | 35 MW | [5] |
| Unnamed substation | Substation | 0.11 km | 34.5 kV | [1] |
| OCRRA | Substation | 0.81 km | 115 kV | [1] |
| Rock Cut Station · National Grid | Substation | 1.52 km | 115 kV | [1] |
| Brighton Avenue Station · National Grid | Substation | 1.83 km | 34.5 kV | [1] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
14| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Name | SU Green Data Centerway/930043986 name=SU Green Data Center | [1] | Likely | 2026-09-27 | Shown |
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 623 Skytop Road, Onondaga, NY 13210 | [1] | Likely | 2026-09-27 | Shown |
| Operator | Syracuse Universityoperator=Syracuse University | [1] | Likely | 2026-09-27 | Shown |
| Utility | Niagara Mohawk Power Corp.territory 13573: NIAGARA MOHAWK POWER CORP. (INVESTOR OWNED, NATIONAL GRID GROUP | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | NYISONEW YORK INDEPENDENT SYSTEM OPERATOR | [3] derived | Likely | — | Shown |
| Balancing authority | NYIS | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Unnamed substation (34.5 kV)way/1324888731 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.1 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| State avg. industrial price | 10.81¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 24.18¢/kWh | [4] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 580 MW | [5] derived | Confirmed | 202502 | Shown |
| Building footprint | 12,200 sq ft | [1] derived | Likely | 2026-09-27 | Shown |