Tract Morris

UnknownUnclassifiedCampusMorris, Grundy County, Illinois
10% profile completeness
10 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
1 GW[1]
Likely
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
H2 2028 – H2 2030
Low confidencewindow, not a prediction
Project verification
Documented development
Interconnection application documented by utility filing / announcement.
Current stage
Interconnection application
Furthest stage with documented evidence
Utility · ISO
Commonwealth Edison (ComEd) · PJM
Substation: Not identified

Power reality

Announced
1 GW[1]
Reported by Edison Electric Institute
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
  • ⚠ No grid, construction or operating record yet backs the 1 GW announced.
  • ⚠ No recorded land acquisition found.
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.
How the time-to-power window was estimated
Evidence used
  • Current stage: Interconnection application (furthest stage with documented evidence)[1]
  • Required: 1 GW
Assumptions
  • From “Interconnection application”, large loads have typically taken 2–4 more years to first power (editorial range; see Methodology).
  • The window is a range of plausible outcomes under these assumptions, not a forecast. It moves as new filings, queue updates or imagery arrive.
Window: H2 2028 – H2 2030

Project verification

Development
  1. AnnouncedSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Planned capacity reported: 1000 MW[1]
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection applicationSep 11, 2026
    Utility filing / announcement
    • Sep 11, 2026 · Transmission Security Agreement with ComEd covering grid infrastructure costs[1]
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under construction
  3. Energization
  4. Operational

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Utility filing / announcement.

Grid path

  1. facility
    Tract Morris
  2. substation
    Not identified
    UnknownUnverified
    No substation mapped within 3 km and none named in filings.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Commonwealth Edison (ComEd)[1]
    DocumentedConfirmed
    Named in a source
  5. ISO / RTO
    PJM[2]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

County-level (approximate)

Location is approximate (county-level (approximate)); the marker does not identify the exact site.

Coordinates
41.28537, -88.41892
County
Grundy County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Developer
Tract[1]Confirmed

“Tract / Data Center Morris, IL”

Utility

“Tract / Data Center Morris, IL” Listed by EEI under this member utility.

No tenants or end users identified in our sources yet.

Power (all fields)

Planned capacity
1 GW[1]Likely

“Tract / Data Center Morris, IL ▪ Data center project, up to 1,000 MW.” — Stated as “up to”.

Current facility power
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[2]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[3]Likelyderived

Control area of the containing utility territory.

Interconnection status
Transmission Security Agreement with ComEd covering grid infrastructure costs[1]Likely

“Transmission Security Agreement (TSA) establishes protections to cover energy infrastructure costs of serving proposed large load projects.”

State avg. industrial price
11.87¢/kWh[5]Confirmed

Illinois statewide average, July 2026.

State avg. commercial price
15.19¢/kWh[5]Confirmed

Illinois statewide average, July 2026.

Generation within 50 km
13.46 GW[6]Confirmedderived

46 EIA-reported plants within 50 km.

Generation queued in county
2.71 GW[4]Confirmedderived

9 active generation interconnection requests in Grundy County: Gas 1,263 MW, Storage 680 MW, Solar 406 MW, Solar + storage 360 MW. Queued projects often don't get built.

Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Cpv Three Rivers Energy Center · CPV Three Rivers, LLCPower plant (Natural Gas)14.8 km1.22 GW[6]
Braidwood Generation Station · Constellation NuclearPower plant (Nuclear)16.6 km2.33 GW[6]
Dresden Generating Station · Constellation NuclearPower plant (Nuclear)17 km1.8 GW[6]
Lasalle Generating Station · Constellation NuclearPower plant (Nuclear)21.4 km2.26 GW[6]
Kendall County Generation Facility · Dynegy Kendall Energy LLCPower plant (Natural Gas)25.4 km1.14 GW[6]
Elwood Energy LLC · Elwood Energy LLCPower plant (Natural Gas)30 km1.35 GW[6]
Jackson Generation, LLC · Jackson Generation, LLCPower plant (Natural Gas)30.9 km1.19 GW[6]
Lincoln Generating Facility · Earthrise Energy, PBCPower plant (Natural Gas)41.5 km623 MW[6]
Largest queued generation in this countyFuelQueue statusMWSource
Three Rivers Energy CenterPJM AD1-039GasUnder construction · proposed 2025-021.26 GW[4]
Pontiac Midpoint – Dresden 345 kVPJM AH2-377StorageIn study · proposed 2024-10450 MW[4]
Katydid Road - Goodings Grove 345 kVPJM AI1-172Solar + storageIn study · proposed 2028-04250 MW[4]
Dresden 138kVPJM AH2-421StorageIn study · proposed 2025-12230 MW[4]
Mazon Blue - Lasalle 138 kVPJM AH2-294SolarIn study · proposed 2026-06150 MW[4]
Mazon-Crescent Ridge 138 kVPJM AD2-066SolarIA signed · proposed 2026-08116 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —
Planned capacity
1 GW[1]Likely

“Tract / Data Center Morris, IL ▪ Data center project, up to 1,000 MW.” — Stated as “up to”.

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

10
FieldValueSourceConfidenceAs ofStatus
DeveloperTract[1] Confirmed2026-09-11Shown
UtilityCommonwealth Edison (ComEd)[1] Confirmed2026-09-11Shown
Planned capacity1 GW[1] Likely2026-09-11Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[2] derivedLikely—Shown
Balancing authorityPJM[3] derivedLikely—Shown
Interconnection statusTransmission Security Agreement with ComEd covering grid infrastructure costs[1] Likely2026-09-11Shown
Generation queued in county2.71 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price11.87¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price15.19¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km13.46 GW[6] derivedConfirmed202502Shown