Unnamed data center — 5225 Exchange Drive
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center — 5225 Exchange Drive
- →substationConsumers Energy substation (46 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 1.7 km away. Proximity does not establish that it serves the site.
- →transmission46 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.15 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 42.96871, -83.77948
- Address
- County
- Genesee County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Michigan statewide average, July 2026.
- State avg. commercial price
Michigan statewide average, July 2026.
- Generation within 50 km
22 EIA-reported plants within 50 km.
- Generation queued in county
6 active generation interconnection requests in Genesee County: Gas 975 MW, Storage 450 MW, Solar 175 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 46 kV line · Consumers Energy | Transmission line | 0.15 km | 46 kV | [1] |
| Assembly Solar III · Assembly Solar III, LLC | Power plant (Solar) | 14.6 km | 79 MW | [6] |
| Assembly Solar Project · Assembly Solar I, LLC | Power plant (Solar) | 14.8 km | 50 MW | [6] |
| Genesee Power Station LP · NorthStar Clean Energy | Power plant (Biomass) | 15.7 km | 35 MW | [6] |
| Assembly Solar II LLC · Assembly Solar II LLC | Power plant (Solar) | 16.9 km | 110 MW | [6] |
| Lyons Road · Lyons Road Solar, LLC | Power plant (Solar) | 29.6 km | 20 MW | [6] |
| Midcontinent Solar, LLC · Midcontinent Solar, LLC | Power plant (Solar) | 30.8 km | 20 MW | [6] |
| Demille Solar Farm · DTE Electric Company | Power plant (Solar) | 37.1 km | 28 MW | [6] |
| Turrill Solar Farm · DTE Electric Company | Power plant (Solar) | 39 km | 20 MW | [6] |
| Consumers Energy substation · Consumers Energy | Substation | 1.7 km | 46 kV | [1] |
| Lennon Road Substation · Consumers Energy | Substation | 2.1 km | 46 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J3935 at THETFORDMISO J3935 | Gas | In study · proposed 2030-03 | 975 MW | [4] |
| J3251 at THETFORDMISO J3251 | Storage | In study · proposed 2028-06 | 200 MW | [4] |
| J3650 at BEVERIDGEMISO J3650 | Storage | In study · proposed 2028-11 | 150 MW | [4] |
| J1203 at Thetford 345kV SubstationMISO J1203 | Solar | Under construction · proposed 2022-06 | 125 MW | [4] |
| J3735 at BEVERIDGE 138kVMISO J3735 | Storage | In study · proposed 2028-06 | 100 MW | [4] |
| J1172 at Dort - Garfield 138 kV Line TapMISO J1172 | Solar | Under construction · proposed 2021-07 | 50 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Address | 5225 Exchange Drive, Flint, MI 48507 | [1] | Likely | 2026-09-27 | Shown |
| Utility | Consumers Energy COterritory 4254: CONSUMERS ENERGY CO (INVESTOR OWNED, CMS ENERGY CORPORATION) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Consumers Energy substation (46 kV)way/1234926735 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 1.7 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 46 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 1.6 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 9.81¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 16.46¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 451 MW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 36,900 sq ft | [1] derived | Likely | 2026-09-27 | Shown |