Unnamed data center is an operating data center in Indiana. Power capacity has not been disclosed or collected yet. Verification: unverified. 4 cited sources.

10% profile completeness
9 claims from 4 sources
Follow

Get changes to Unnamed data center

How often

Double opt-in; one-click unsubscribe in every email. We store only your email and what you follow. More

Or subscribe in a feed reader: RSS / Atom

Cite this
Text
Datacenter Source. “Unnamed data center.” /facilities/unnamed-data-center-bartholomew-county-in. Data as of 2026-10-12. Accessed 2026-10-12.
BibTeX
@misc{datacentersource_unnamed_data_center_bartholomew_county_i_2026,
  title = {{Unnamed data center}},
  author = {{Datacenter Source}},
  year = {2026},
  howpublished = {\url{/facilities/unnamed-data-center-bartholomew-county-in}},
  note = {Data as of 2026-10-12; accessed 2026-10-12. Compiled from cited sources, including OpenStreetMap contributors (ODbL) and Epoch AI (CC BY 4.0)},
}

Please also cite the original source of any specific figure (linked beside it).

Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
2,500 sq ft[1]
Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Not identified
Substation: Unnamed substation (69 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalOct 12, 2026
    Community map
    • Oct 12, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Unnamed substation (69 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.71 km away. Proximity does not establish that it serves the site.
  3. transmission
    230 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.33 km away). Not confirmed as the supply path.
  4. utility
    Not identified
    UnknownUnverified
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
MISO J1390
J1390 at Gallagher Station - Columbus 230 kV Line Tap · Solar
Generation at a nearby substation
Unverified
Queue POI “Gallagher Station - Columbus 230 kV Line Tap” names Columbus Substation (345kV), a substation mapped 1.98 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
Under construction
Done · DPP-2019 · GIA · Under Construction
150 ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Oct 12, 2026.150Apr 29, 2019Aug 1, 2022Gallagher Station - Columbus 230 kV Line Tap
TO: DUKE ENERGY INDIANA, LLC
[2] Oct 12, 2026

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

LOCAL IMPACT

Water · generation · incentives · regulation · rates

Water & cooling

Not yet collected: we haven't found a source for water use or the cooling type at this site. Know one? Add a source

On-site generation & air permits

Not yet collected: we haven't found a source for on-site generation or an air permit for this site. Know one? Add a source

Incentives

Not yet collected: we haven't found a source for tax abatements, PILOTs or other incentives for this project. Know one? Add a source

Regulatory events

Not yet collected: we haven't found a source for hearings, rezonings, permits or commission proceedings. Know one? Add a source

Utility & rates

Not yet collected: we haven't found a source for a large-load tariff or commission docket for the serving utility. Know one? Add a source

Location & imagery

Mapped outline
Coordinates
39.18586, -85.88707
County
Bartholomew County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Not identified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence

No tenants or end users identified in our sources yet.

No ownership information sourced yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

Nearest mapped substation
Unnamed substation (69 kV)[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.7 km[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived
Highest-voltage line nearby
230 kV[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Sep 28, 2026.Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
9.16¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Indiana statewide average, July 2026.

State avg. commercial price
13.30¢/kWh[3]ConfirmedBacked by a filing, deed, permit, interconnection-queue record, or a government or utility record. As of Jul 2026.Confirmed

Indiana statewide average, July 2026.

Generation within 50 km
16 MW[4]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Jan 1, 202502.Confirmedderived

5 EIA-reported plants within 50 km.

Generation queued in county
150 MW[2]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Confirmedderived

1 active generation interconnection requests in Bartholomew County: Solar 150 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
60 kV lineTransmission line0.65 km60 kV[1]
69 kV lineTransmission line0.71 km69 kV[1]
230 kV lineTransmission line1.33 km230 kV[1]
Camp Atterbury Microgrid Hybrid · Duke Energy Indiana, LLCPower plant (Batteries)22.9 km7 MW[4]
Jackson CO. Solar Res · Hoosier Energy R E C, IncPower plant (Solar)36.1 km1 MW[4]
Decatur CO. Solar Res (In) · Hoosier Energy R E C, IncPower plant (Solar)36.9 km1 MW[4]
Johnson CO. Solar Res · Hoosier Energy R E C, IncPower plant (Solar)40.1 km1 MW[4]
Poet Biorefining - Shelbyville · POET Biorefing- ShelbyvillePower plant (Natural Gas)42 km6 MW[4]
Unnamed substationSubstation0.71 km69 kV[1]
Columbus Substation (345kV) · Duke EnergySubstation1.98 km345 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
J1390 at Gallagher Station - Columbus 230 kV Line TapMISO J1390SolarUnder construction · proposed 2022-08150 MW[2]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
2,500 sq ft[1]Est.Modeled, measured from satellite imagery, inferred from community mapping, or computed by this site. Not a disclosed figure. As of Oct 12, 2026.Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

9
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-10-12Shown
Nearest mapped substationUnnamed substation (69 kV)way/773684162[1] derivedLikely2026-09-28Shown
Distance to substation0.7 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county150 MW[2] derivedConfirmed2026-10-12Shown
State avg. industrial price9.16¢/kWh[3] Confirmed2026-07Shown
State avg. commercial price13.30¢/kWh[3] Confirmed2026-07Shown
Generation within 50 km16 MW[4] derivedConfirmed202502Shown
Building footprint2,500 sq ft[1] derivedLikely2026-10-12Shown