Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationNot identifiedUnknownUnverifiedNo substation mapped within 3 km and none named in filings.
- →transmissionNot identifiedUnknownUnverifiedNo transmission line mapped within 2 km.
- →utilityWisconsin Power & Light CO[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 43.63833, -89.72140
- County
- Columbia County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wppi Energy.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- State avg. industrial price
Wisconsin statewide average, July 2026.
- State avg. commercial price
Wisconsin statewide average, July 2026.
- Generation within 50 km
16 EIA-reported plants within 50 km.
- Generation queued in county
10 active generation interconnection requests in Columbia County: Solar 821 MW, Storage 720 MW, Wind 250 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Kilbourn · Wisconsin Power & Light Co | Power plant (Hydroelectric) | 5 km | 10 MW | [6] |
| Columbia (Wi) · Wisconsin Power & Light Co | Power plant (Coal) | 29.6 km | 1.13 GW | [6] |
| Castle Rock · Wisconsin River Power Company | Power plant (Hydroelectric) | 31.3 km | 14 MW | [6] |
| Adams PV Plant · Adams PV Plant (WI) | Power plant (Solar) | 34.8 km | 7 MW | [6] |
| Prairie Du Sac · Wisconsin Power & Light Co | Power plant (Hydroelectric) | 36.5 km | 29 MW | [6] |
| Portage Solar Plant · Portage Solar Plant | Power plant (Solar) | 38.6 km | 10 MW | [6] |
| New Lisbon · City of New Lisbon | Power plant (Petroleum) | 44.6 km | 8 MW | [6] |
| Glacier Hills · Wisconsin Electric Power Co | Power plant (Wind) | 46.9 km | 162 MW | [6] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| J2304 at Columbia - Rockdale 345.0kVMISO J2304 | Storage | In study · proposed 2024-04 | 400 MW | [4] |
| J2423 at Columbia-North Madison 345kVMISO J2423 | Storage | In study · proposed 2027-10 | 300 MW | [4] |
| J3639 at Columbia - Rockdale 345.0kVMISO J3639 | Wind | In study · proposed 2028-04 | 250 MW | [4] |
| J1629 at Columbia SW YD(ALTE) - South Fond Du Lac SW YD 345 KV T-LineMISO J1629 | Solar | IA signed · proposed 2024-07 | 200 MW | [4] |
| J1943 at Columbia - North Madison 345/138 kV 345.0kVMISO J1943 | Solar | In study · proposed 2024-10 | 200 MW | [4] |
| J1746 at Columbia 138 kVMISO J1746 | Solar | IA signed · proposed 2025-06 | 150 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
9| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Wisconsin Power & Light COterritory 20856: WISCONSIN POWER & LIGHT CO (INVESTOR OWNED, ALLIANT ENERGY CORP | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Generation queued in county | 1.79 GW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 10.46¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 13.93¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.39 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 400 sq ft | [1] derived | Likely | 2026-09-27 | Shown |