Wisconsin
Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 10.46¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced4.02 GW
- Interconnection requests—
- Contracted / approved—
- Under construction3.57 GW
- Operational442 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
No large gaps in this scope.
Interconnection queues
Active requests to connect to the grid (MISO). Requests are applications, not commitments — most never get built.
Markets
Click through to drill down
| Name | Facilities | Online | Pipeline | |
|---|---|---|---|---|
| Southeast Wisconsin | 5 | 442 MW | 2.27 GW |
Largest operators & owners
Online + pipeline MW at linked facilities
- Microsoft442 MW + 2.27 GW · 1 sites
- Oracle0 MW + 1.3 GW · 1 sites
- Vantage Data Centers0 MW + 1.3 GW · 1 sites
- Potawatomi Business Development Corporation— · 1 sites
- Lumen Technologies— · 1 sites
- Involta— · 1 sites
- We Energies— · 1 sites
- West Wisconsin Telcom— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
Utility exposure
Most likely retail utility by location (approximate)
- We Energies442 MW + 3.57 GW · 7 sites
- Wisconsin Power & Light CO— · 4 sites
- Northern States Power CO— · 1 sites
Grid operators (ISO / RTO)
By facility location
- MISO442 MW + 3.57 GW · 12 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Microsoft Fairwater Wisconsin | Operating + expanding | 442 MW | 2.27 GW |
| OpenAI Stargate Wisconsin | Under construction | — | 1.3 GW |
Facilities by status
- Operating10
- Operating + expanding1
- Under construction1