Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationComEd Elk Grove 138kV Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.43 km away. Proximity does not establish that it serves the site.
- →transmissionDes Plaines - Lombard 345 kV & Elk Grove - Tonne 138 kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.24 km away). Not confirmed as the supply path.
- →utilityCommonwealth Edison (ComEd)[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 42.02308, -87.96147
- County
- Cook County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Location falls inside this utility's retail service territory.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Illinois statewide average, July 2026.
- State avg. commercial price
Illinois statewide average, July 2026.
- Generation within 50 km
51 EIA-reported plants within 50 km.
- Generation queued in county
8 active generation interconnection requests in Cook County: Storage 908 MW, Solar + storage 44 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Des Plaines - Lombard 345 kV & Elk Grove - Tonne 138 kV · Commonwealth Edison | Transmission line | 0.24 km | 345 kV | [1] |
| Des Plaines - Itasca 345 kV · Commonwealth Edison | Transmission line | 0.26 km | 345 kV | [1] |
| 345 kV line · Commonwealth Edison | Transmission line | 0.28 km | 345 kV | [1] |
| 138 kV line · Commonwealth Edison | Transmission line | 0.28 km | 138 kV | [1] |
| Des Plaines - Lombard 345 kV & Des Plaines - Elk Grove 138 kV · Commonwealth Edison | Transmission line | 0.75 km | 345 kV | [1] |
| Schaumburg - Elk Grove 138 kV · Commonwealth Edison | Transmission line | 0.78 km | 138 kV | [1] |
| Winnetka · Village of Winnetka - (IL) | Power plant (Natural Gas) | 21.6 km | 33 MW | [6] |
| Mrp Elgin LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 23.5 km | 489 MW | [6] |
| Mrp Rocky Road LLC · Lincoln Operating Services, LLC | Power plant (Natural Gas) | 24.3 km | 336 MW | [6] |
| Ingredion Incorporated · Ingredion Inc - Illinois | Power plant (Natural Gas) | 29.6 km | 51 MW | [6] |
| University of Illinois Cogen Facility · University of Illinois | Power plant (Natural Gas) | 30.9 km | 56 MW | [6] |
| Aurora · Aurora Generation LLC | Power plant (Natural Gas) | 31.9 km | 991 MW | [6] |
| Fisk Street · Midwest Generations EME LLC | Power plant (Petroleum) | 31.9 km | 197 MW | [6] |
| Waukegan · Midwest Generations EME LLC | Power plant (Petroleum) | 41.9 km | 108 MW | [6] |
| ComEd Elk Grove 138kV Substation · Commonwealth Edison | Substation | 0.43 km | 138 kV | [1] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 0.59 km | — | [1] |
| Commonwealth Edison substation · Commonwealth Edison | Substation | 0.62 km | — | [1] |
| Unnamed substation | Substation | 0.74 km | — | [1] |
| Unnamed substation | Substation | 0.81 km | — | [1] |
| Landmeier Substation · Commonwealth Edison | Substation | 0.88 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Calumet-Burnham 345 kVPJM AG1-298 - moved to TC1 | Storage | In study · proposed 2023-06 | 500 MW | [4] |
| Burnham 138kVPJM AF2-441 - moved to TC1 | Storage | In study · proposed 2024-05 | 200 MW | [4] |
| Chicago Heights 138kVPJM AI1-155 | Storage | In study · proposed 2027-01 | 110 MW | [4] |
| River EC 138 kVPJM AH1-663 | Storage | In study · proposed 2024-05 | 58 MW | [4] |
| Matteson - East Frankfort 138 kVPJM AH2-380 | Solar + storage | In study · proposed 2026-03 | 44 MW | [4] |
| Calumet BESSPJM AF2-031 | Storage | In study · proposed 2027-12 | 20 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational2026[1]
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
All claims (provenance audit)
13| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Commonwealth Edison (ComEd)territory 4110: COMMONWEALTH EDISON CO (INVESTOR OWNED, EXELON CORP) | [2] derived | Likely | 2022 | Shown |
| ISO / RTO | PJMPJM INTERCONNECTION, LLC | [3] derived | Likely | — | Shown |
| Balancing authority | PJM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | ComEd Elk Grove 138kV Substation (138 kV)way/994824354 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.4 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 345 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 952 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 11.87¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 15.19¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 2.45 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 97,000 sq ft | [1] derived | Likely | 2026-09-27 | Shown |
| First operational | 2026start_date=2026 | [1] | Likely | 2026-09-27 | Shown |