DC
/

Unnamed data center

OperatingUnclassifiedBuildingGloucester County, New Jersey
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
41,100 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
PSE&G · PJM
Substation: Thorofare Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Thorofare Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.86 km away. Proximity does not establish that it serves the site.
  3. transmission
    Mickleton - Thorofare (230 kV)[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.19 km away). Not confirmed as the supply path.
  4. utility
    PSE&G[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
39.83093, -75.19532
County
Gloucester County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
PSE&G[2]Likely

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
PSE&G[2]Likely

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Thorofare Substation (230 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.9 km[1]Likelyderived
Highest-voltage line nearby
230 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
15.63¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

State avg. commercial price
19.17¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

Generation within 50 km
7.51 GW[6]Confirmedderived

127 EIA-reported plants within 50 km.

Generation queued in county
1.07 GW[4]Confirmedderived

21 active generation interconnection requests in Gloucester County: Storage 718 MW, Gas 158 MW, Solar 129 MW, Solar + storage 60 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Mickleton - Thorofare · Public Service Enterprise GroupTransmission line0.19 km230 kV[1]
230 kV lineTransmission line0.86 km230 kV[1]
Thorofare - Deptford · Public Service Enterprise GroupTransmission line0.88 km230 kV[1]
Thorofare - Eagle Point · Public Service Enterprise GroupTransmission line0.88 km230 kV[1]
Thorofare - Deptford & Eagle Point · Public Service Enterprise GroupTransmission line1.31 km230 kV[1]
West Deptford Energy Station · West Deptford Energy LLCPower plant (Natural Gas)2.5 km735 MW[6]
Eddystone Generating Station · Constellation Power, IncPower plant (Natural Gas)11.3 km820 MW[6]
Liberty Electric Power Plant · Liberty Electric Power LLCPower plant (Natural Gas)12.5 km562 MW[6]
Marcus Hook Energy LP · Marcus Hook Energy LPPower plant (Natural Gas)19.5 km877 MW[6]
Edge Moor · Calpine Mid-Atlantic Generation LLCPower plant (Natural Gas)28.3 km707 MW[6]
Hay Road · Calpine Mid-Atlantic Generation LLCPower plant (Natural Gas)28.4 km1.13 GW[6]
Croydon Ct Generating Station · Constellation Power, IncPower plant (Petroleum)37.9 km391 MW[6]
Delaware City Plant · Delaware City Refining Company LLCPower plant (Natural Gas)46.3 km265 MW[6]
Thorofare Substation · Public Service Enterprise GroupSubstation0.86 km230 kV[1]
PSE&G substation · PSE&GSubstation1.63 km26 kV[1]
Public Service Enterprise Group substation · Public Service Enterprise GroupSubstation1.96 km26 kV[1]
Crown Point Substation · Public Service Enterprise GroupSubstation2.41 km230 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Bridgeport 230 kVPJM AG2-450StorageIn study · proposed 2025-03225 MW[4]
Bridgeport 230kVPJM AH2-131StorageIn study · proposed 2025-03225 MW[4]
Monroe 138kVPJM AH2-378AStorageIn study · proposed 2025-12200 MW[4]
Paulsboro 69 kVPJM AG2-180GasIn study · proposed 2021-0279 MW[4]
Paulsboro 69 kV IIPJM AH1-078GasIn study · proposed 2022-0979 MW[4]
Woodstown-High Street 69 kVPJM AG2-627Solar + storageIn study · proposed 2024-0660 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
41,100 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityPSE&Gterritory 15477: PUBLIC SERVICE ELEC & GAS CO (INVESTOR OWNED, PUBLIC SERVICE EN[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationThorofare Substation (230 kV)way/95283902[1] derivedLikely2026-09-28Shown
Distance to substation0.9 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby230 kV[1] derivedLikely2026-09-28Shown
Generation queued in county1.07 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price15.63¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price19.17¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km7.51 GW[6] derivedConfirmed202502Shown
Building footprint41,100 sq ft[1] derivedLikely2026-09-27Shown