DC
/

Unnamed data center

OperatingUnclassifiedBuildingHarris County, Texas
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
98,500 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Entergy · MISO
Substation: Addicks Substation (345 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Addicks Substation (345 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.24 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.22 km away). Not confirmed as the supply path.
  4. utility
    Entergy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    MISO[3]
    Service territoryLikely
    Balancing authority: MISO
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
29.82172, -95.57077
County
Harris County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:
Entergy[2]Unverified

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility
Entergy[2]Unverified

Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: San Bernard Electric Coop, INC, Centerpoint Energy.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
MISO[3]Likelyderived

Location falls inside overlapping MISO and ERCOT footprints; chosen by the balancing areas of the overlapping utilities.

Balancing authority
MISO[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Addicks Substation (345 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
12.11 GW[6]Confirmedderived

91 EIA-reported plants within 50 km.

Generation queued in county
6.56 GW[4]Confirmedderived

29 active generation interconnection requests in Harris County: Storage 5,957 MW, Gas 501 MW, Solar 50 MW, Other 50 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV lineTransmission line0.1 km138 kV[1]
345 kV lineTransmission line0.22 km345 kV[1]
Addicks to White Oak 345kV · CenterPoint EnergyTransmission line0.29 km345 kV[1]
O'Brian - Addicks 345kVTransmission line0.31 km345 kV[1]
Brittmoore to Addicks 138kV · CenterPoint EnergyTransmission line0.46 km138 kV[1]
T H Wharton · NRG Texas Power LLCPower plant (Natural Gas)13.9 km1 GW[6]
Channel Energy Center LLC · Channel Energy Center LLCPower plant (Natural Gas)34.6 km760 MW[6]
W A Parish · NRG Texas Power LLCPower plant (Coal)38.1 km3.63 GW[6]
Jack Fusco Energy Center · Brazos Valley EnergyPower plant (Natural Gas)39.1 km538 MW[6]
Pasadena Cogeneration · Pasadena Cogeneration LPPower plant (Natural Gas)39.6 km746 MW[6]
Channelview Cogeneration Plant · EIF Channelview Cogeneration LLCPower plant (Natural Gas)43.3 km750 MW[6]
Deer Park Energy Center · Deer Park Energy CenterPower plant (Natural Gas)43.8 km1.19 GW[6]
Odyssey Energy Altura Cogen, LLC · Odyssey Operating ServicesPower plant (Natural Gas)44.7 km473 MW[6]
Addicks Substation · CenterPoint EnergySubstation0.24 km345 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Hobby BESS IERCOT 26INR0546 · Airport Storage II LLCStorageIn study · proposed 2027-10603 MW[4]
Knight Airport BESS IERCOT 26INR0545 · Airport Storage I LLCStorageIn study · proposed 2027-10522 MW[4]
NRG Greens Bayou 6 (TEF-Due Diligence)ERCOT 24INR0410 · NRG Greens Bayou 6 LLCGasIA signed · proposed 2028-05445 MW[4]
Beacon StorageERCOT 23INR0127 · AES Distributed Energy, IncStorageUnder construction · proposed 2029-10409 MW[4]
Sigma StorageERCOT 23INR0126 · AES Distributed Energy, IncStorageUnder construction · proposed 2029-10408 MW[4]
Claire BESSERCOT 24INR0500 · BRP Blue Topaz 3, LLCStorageIn study · proposed 2027-12406 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
98,500 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityEntergyterritory 55937: ENTERGY TEXAS INC. (INVESTOR OWNED, ENTERGY CORP)[2] derivedUnverified2022Shown
ISO / RTOMISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | ELECTRIC RELIABIL[3] derivedLikely—Shown
Balancing authorityMISO[2] derivedLikely—Shown
Nearest mapped substationAddicks Substation (345 kV)way/126444901[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county6.56 GW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km12.11 GW[6] derivedConfirmed202502Shown
Building footprint98,500 sq ft[1] derivedLikely2026-09-27Shown