Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationCampstool Substation (115 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.33 km away. Proximity does not establish that it serves the site.
- →transmission115 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.27 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 41.14134, -104.71676
- County
- Laramie County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 3 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Wapa-- Western Area Power Administration, High West Energy, INC.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Outside all ISO/RTO footprints; balancing authority shown separately.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Wyoming statewide average, July 2026.
- State avg. commercial price
Wyoming statewide average, July 2026.
- Generation within 50 km
10 EIA-reported plants within 50 km.
- Generation queued in county
3 active generation interconnection requests in Laramie County: Wind 650 MW, Hybrid 330 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 115 kV line | Transmission line | 0.27 km | 115 kV | [1] |
| East Business Park to Campstool · Cheyenne Light Fuel and Power | Transmission line | 0.27 km | 115 kV | [1] |
| Archer to Cheyenne Prairie to East Business Park · Cheyenne Light Fuel and Power | Transmission line | 1.25 km | 115 kV | [1] |
| Archer to Cheyenne Prairie · Cheyenne Light Fuel and Power | Transmission line | 1.63 km | 115 kV | [1] |
| Cheyenne Prairie to East Business Park · Cheyenne Light Fuel and Power | Transmission line | 1.63 km | 115 kV | [1] |
| Cheyenne Prairie Generating Station · Black Hills Service Company LLC | Power plant (Natural Gas) | 2 km | 131 MW | [6] |
| South Cheyenne Solar · Southern Power Co | Power plant (Solar) | 13.6 km | 150 MW | [6] |
| Corriedale Wind Energy · Black Hills Service Company LLC | Power plant (Wind) | 22.6 km | 53 MW | [6] |
| Roundhouse Renewable Energy II · Roundhouse Renewable Energy II, LLC | Power plant (Wind) | 25.3 km | 106 MW | [6] |
| Silver Sage Windpower · Duke Energy Renewables Services | Power plant (Wind) | 25.8 km | 42 MW | [6] |
| Roundhouse Wind Energy Project · Roundhouse Renewable Energy, LLC | Power plant (Wind) | 33.1 km | 226 MW | [6] |
| Bison Solar LLC · Bison Solar LLC | Power plant (Solar) | 39.5 km | 30 MW | [6] |
| Rawhide · Platte River Power Authority | Power plant (Natural Gas) | 40.3 km | 668 MW | [6] |
| Campstool Substation · Cheyenne Light Fuel and Power | Substation | 0.33 km | 115 kV | [1] |
| East Business Park Substation · Cheyenne Light Fuel and Power | Substation | 2.09 km | 115 kV | [1] |
| Cheyenne Prairie Generation · Cheyenne Light Fuel and Power | Substation | 2.17 km | 115 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| GI-TC-2024-16 at Ault-Laramie River Station 345 LineSPP GI-TC-2024-16 | Wind | IA signed · proposed 2029-06 | 400 MW | [4] |
| GI-CS-2025-04 at Ault LRS 345 LineSPP GI-CS-2025-04 | Hybrid | In study · proposed 2029-11 | 330 MW | [4] |
| GI-TC-2024-15 at Big Bear 345 Switching StationSPP GI-TC-2024-15 | Wind | IA signed · proposed 2029-09 | 250 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Black Hills Energyterritory 19545: BLACK HILLS POWER, INC. (INVESTOR OWNED, BLACK HILLS POWER INC) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | None (non-RTO region) | [3] derived | Likely | — | Shown |
| Balancing authority | WACM | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Campstool Substation (115 kV)way/1197757145 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 115 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 980 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 8.62¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 10.26¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.46 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 247,500 sq ft | [1] derived | Likely | 2026-09-27 | Shown |