DC
/

Wyoming

Facilities
24
3 campuses
Power online
182 MW
1 sites reporting
Under construction
67 MW
planned MW at active sites
Planned
—
0 planned sites (MW not disclosed)
AI campuses
1
182 MW online · 67 MW pipeline
AI compute
0.17M
H100-equivalents (est.)
Capital (reported + est.)
$5.8B

Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.62¢/kWh (EIA).

AI data center capacity over time

Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly

0 MW75 MW150 MW225 MW300 MW202720282029
Observed (satellite-tracked) Projected

Construction pipeline by expected completion

MW from phases with a projected completion date

2027

Power reality

Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.

  • Announced551 MW
  • Interconnection requests—
  • Contracted / approved88 MW
  • Under construction67 MW
  • Operational182 MW
Pending MW by time to power

Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.

Largest gaps: announced vs documented
Verified operating: 1Grid-backed: 1Unverified: 22

Interconnection queues

Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.

Generation seeking interconnection3.19 GW · 12 requests
Wind 1.6 GWSolar + storage 950 MWHybrid 330 MWSolar 310 MW

Largest operators & owners

Online + pipeline MW at linked facilities

Online Under construction + planned

Largest customers & end users

Tenants and workload owners, where sourced

Online Under construction + planned

Utility exposure

Most likely retail utility by location (approximate)

Online Under construction + planned

Grid operators (ISO / RTO)

By facility location

Online Under construction + planned
  • None (non-RTO region)182 MW + 67 MW · 24 sites

Largest facilities

By online + pipeline MW

FacilityStatusOnlinePipeline
Meta CheyenneOperating + expanding182 MW67 MW

Facilities by status

  • Operating21
  • Operating + expanding1
  • Unknown2