Totals only include facilities with a reported or estimated figure; most sites don't disclose power, so these are floors, not market size estimates. Online = operating sites; pipeline = remaining planned MW at sites under construction or planned. Average industrial electricity price: 8.62¢/kWh (EIA).
AI data center capacity over time
Facility power at satellite-tracked AI campuses (Epoch AI timelines), quarterly
Construction pipeline by expected completion
MW from phases with a projected completion date
Power reality
Announced capacity vs. what grid records, construction and operation document. Facility-level sums; sources differ in coverage.
- Announced551 MW
- Interconnection requests—
- Contracted / approved88 MW
- Under construction67 MW
- Operational182 MW
Bucketed by the midpoint of each site's evidence-based window. Windows are ranges, not forecasts.
- Related Digital / CoreWeave Cheyenne302 MW / 88 MW
Interconnection queues
Active requests to connect to the grid (SPP). Requests are applications, not commitments — most never get built.
Largest operators & owners
Online + pipeline MW at linked facilities
- Meta182 MW + 67 MW · 1 sites
- Microsoft— · 3 sites
- Related Digital— · 1 sites
Largest customers & end users
Tenants and workload owners, where sourced
Utility exposure
Most likely retail utility by location (approximate)
- Black Hills Energy182 MW + 67 MW · 23 sites
- Powder River Energy Corp— · 1 sites
Grid operators (ISO / RTO)
By facility location
- None (non-RTO region)182 MW + 67 MW · 24 sites
Largest facilities
By online + pipeline MW
| Facility | Status | Online | Pipeline |
|---|---|---|---|
| Meta Cheyenne | Operating + expanding | 182 MW | 67 MW |
Facilities by status
- Operating21
- Operating + expanding1
- Unknown2