DC
/

Unnamed data center

OperatingUnclassifiedBuildingMecklenburg County, Virginia
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
140,800 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Dominion Energy · PJM
Substation: Unnamed substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Unnamed substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.5 km away. Proximity does not establish that it serves the site.
  3. transmission
    115 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (0.08 km away). Not confirmed as the supply path.
  4. utility
    Dominion Energy[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
36.68950, -78.37759
County
Mecklenburg County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply
Utility:

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Mecklenburg Electric Cooperative.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Unnamed substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.5 km[1]Likelyderived
Highest-voltage line nearby
115 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
10.07¢/kWh[5]Confirmed

Virginia statewide average, July 2026.

State avg. commercial price
11.68¢/kWh[5]Confirmed

Virginia statewide average, July 2026.

Generation within 50 km
2.66 GW[6]Confirmedderived

44 EIA-reported plants within 50 km.

Generation queued in county
2.86 GW[4]Confirmedderived

27 active generation interconnection requests in Mecklenburg County: Solar 1,629 MW, Storage 1,074 MW, Solar + storage 155 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV line · Virginia Electric and Power CompanyTransmission line0.08 km115 kV[1]
John H Kerr · USCE-Wilmington DistrictPower plant (Hydroelectric)12.1 km297 MW[6]
Otter Creek Solar · Dominion Energy Inc.Power plant (Solar)17.6 km60 MW[6]
Grasshopper Solar · Dominion Energy Inc.Power plant (Solar)19 km80 MW[6]
Hawtree Solar · Hawtree Creek Farm Solar, LLCPower plant (Solar)29.9 km65 MW[6]
Clover · Virginia Electric & Power CoPower plant (Coal)35.3 km877 MW[6]
Piney Creek Solar · Dominion Energy Inc.Power plant (Solar)37.9 km80 MW[6]
Foxhound · Foxhound Solar, LLCPower plant (Solar)38.5 km83 MW[6]
Mayo · Duke Energy Progress - (NC)Power plant (Coal)49.3 km704 MW[6]
Unnamed substationSubstation0.5 km115 kV[1]
Virginia Electric and Power Company substation · Virginia Electric and Power CompanySubstation0.7 km115 kV[1]
Unnamed substationSubstation0.97 km115 kV[1]
Unnamed substationSubstation1.35 km115 kV[1]
Virginia Electric and Power Company substation · Virginia Electric and Power CompanySubstation1.4 km115 kV[1]
Virginia Electric and Power Company substation · Virginia Electric and Power CompanySubstation2.4 km115 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
Boydton Plank Road 115 kVPJM AH1-052SolarIn study · proposed 2025-04260 MW[4]
Boydton Plank Road 115 kVPJM AI1-016StorageIn study · proposed 2026-12260 MW[4]
Boydton Plank Road 115 kVPJM AG2-631SolarIn study · proposed 2025-04200 MW[4]
Boydton Plank Road 115 kVPJM AG2-632StorageIn study · proposed 2025-04200 MW[4]
Central VA- Chase City 115kVPJM AH2-271SolarIn study · proposed 2026-12150 MW[4]
Chase City- Herbert Plant Substation 115kVPJM AH1-527SolarIn study · proposed 2025-03149 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
140,800 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityDominion Energyterritory 19876: VIRGINIA ELECTRIC & POWER CO (INVESTOR OWNED, DOMINION RESOURCE[2] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationUnnamed substation (115 kV)way/1074595316[1] derivedLikely2026-09-28Shown
Distance to substation0.5 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby115 kV[1] derivedLikely2026-09-28Shown
Generation queued in county2.86 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price10.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price11.68¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km2.66 GW[6] derivedConfirmed202502Shown
Building footprint140,800 sq ft[1] derivedLikely2026-09-27Shown