Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationGosling Substation (138 kV)[1]Proximity onlyUnverifiedNearest mapped substation, 0.79 km away. Proximity does not establish that it serves the site.
- →transmissionGoslin - Metro 138kV[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.69 km away). Not confirmed as the supply path.
- →
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 30.17784, -95.48645
- County
- Montgomery County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside overlapping MISO and ERCOT footprints; chosen by the balancing areas of the overlapping utilities.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
36 EIA-reported plants within 50 km.
- Generation queued in county
2 active generation interconnection requests in Montgomery County: Storage 217 MW, Solar 206 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| Goslin - Metro 138kV · Entergy | Transmission line | 0.69 km | 138 kV | [1] |
| 138 kV line | Transmission line | 0.76 km | 138 kV | [1] |
| 2447 · Entergy | Transmission line | 0.84 km | 138 kV | [1] |
| 1160 · Entergy | Transmission line | 0.85 km | 138 kV | [1] |
| 1160;2447 · Entergy | Transmission line | 0.91 km | 138 kV | [1] |
| T H Wharton · NRG Texas Power LLC | Power plant (Natural Gas) | 26.6 km | 1 GW | [6] |
| Lewis Creek · Entergy Texas Inc. | Power plant (Natural Gas) | 28.9 km | 500 MW | [6] |
| Montgomery County · Entergy Texas Inc. | Power plant (Natural Gas) | 29.5 km | 1 GW | [6] |
| Hebhoustondistributioncenter · Texas Microgrid, LLC | Power plant (Natural Gas) | 37.9 km | 13 MW | [6] |
| Crockett Bess · Prologis Logistics Services Incorporated BESS | Power plant (Batteries) | 45.8 km | 10 MW | [6] |
| Greens Bayou · NRG Texas Power LLC | Power plant (Natural Gas) | 47.2 km | 327 MW | [6] |
| Chamon Power LLC · Peaker Power, LLC | Power plant (Natural Gas) | 48.8 km | 86 MW | [6] |
| Sjrr Power LLC · SJRR | Power plant (Natural Gas) | 48.8 km | 86 MW | [6] |
| Gosling Substation · Entergy | Substation | 0.79 km | 138 kV | [1] |
| Metro Substation · Entergy | Substation | 2.35 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Two Barbaras BESSERCOT 27INR0109 · Two Barbaras BESS | Storage | IA signed · proposed 2029-01 | 217 MW | [7] |
| J3586 at JACINTO - PEACH CREEK 230.0kVMISO J3586 | Solar | In study · proposed 2028-01 | 206 MW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Entergyterritory 55937: ENTERGY TEXAS INC. (INVESTOR OWNED, ENTERGY CORP) | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | MISOMIDCONTINENT INDEPENDENT TRANSMISSION SYSTEM OPERATOR, INC.. | ELECTRIC RELIABIL | [3] derived | Likely | — | Shown |
| Balancing authority | MISO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Gosling Substation (138 kV)way/205392970 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.8 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 423 MW | [4] derived | Confirmed | 2026-09-27 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 3.07 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 126,500 sq ft | [1] derived | Likely | 2026-09-27 | Shown |