DC
/

Unnamed data center

OperatingUnclassifiedBuildingOcean County, New Jersey
10% profile completeness
11 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Floor area
Not yet sourced
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Jersey Central Power & Light · PJM
Substation: Manchester Substation (230 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Manchester Substation (230 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.73 km away. Proximity does not establish that it serves the site.
  3. transmission
    Not identified
    UnknownUnverified
    No transmission line mapped within 2 km.
  4. utility
    Jersey Central Power & Light[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
40.04262, -74.27962
County
Ocean County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Location falls inside this utility's retail service territory.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Manchester Substation (230 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.7 km[1]Likelyderived
State avg. industrial price
15.63¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

State avg. commercial price
19.17¢/kWh[5]Confirmed

New Jersey statewide average, July 2026.

Generation within 50 km
3.95 GW[6]Confirmedderived

128 EIA-reported plants within 50 km.

Generation queued in county
3.33 GW[4]Confirmedderived

12 active generation interconnection requests in Ocean County: Offshore wind 2,959 MW, Storage 270 MW, Solar 99 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
Naea Lakewood LLC · Essential Power Operating Company, LLCPower plant (Natural Gas)9.7 km265 MW[6]
Naea Ocean Peaking Power LLC · Essential Power Operating Company, LLCPower plant (Natural Gas)9.8 km336 MW[6]
Forked River · Forked River Power, LLCPower plant (Natural Gas)26 km65 MW[6]
Fairless Energy Center · Edgewater Generation, LLCPower plant (Natural Gas)40.9 km1.28 GW[6]
Sayreville Cogeneration Facility · Sayreville Power Generation LPPower plant (Natural Gas)44.4 km292 MW[6]
Red Oak Power LLC · Red Oak Operating Services LLCPower plant (Natural Gas)45.5 km776 MW[6]
Falls · Constellation Power, IncPower plant (Petroleum)45.9 km51 MW[6]
Sayreville · Sayreville Power, LLCPower plant (Petroleum)48.6 km217 MW[6]
Manchester Substation · Jersey Central Power and LightSubstation0.73 km230 kV[1]
Unnamed substationSubstation2.74 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Larrabee 230 kVPJM AI2-131Offshore windIn study · proposed 2030-02882 MW[4]
Ocean WindPJM AE1-020Offshore windSuspended · proposed 2026-02816 MW[4]
Oyster Creek 230 kVPJM AI2-325Offshore windIn study · proposed 2024-12816 MW[4]
Larrabee 230 kVPJM AI2-132Offshore windIn study · proposed 2030-02445 MW[4]
Lakewood 230 kV IIPJM AI2-052StorageIn study · proposed 2027-06170 MW[4]
Lakewood 230 kVPJM AH2-269StorageIn study · proposed 2026-06100 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Site area
67.5 acres[1]Likelyderived

Area of the mapped OSM site outline.

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

11
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityJersey Central Power & Lightterritory 9726: JERSEY CENTRAL POWER & LT CO (INVESTOR OWNED, FIRSTENERGY CORP)[2] derivedLikely2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationManchester Substation (230 kV)way/540016880[1] derivedLikely2026-09-28Shown
Distance to substation0.7 km[1] derivedLikely2026-09-28Shown
Generation queued in county3.33 GW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price15.63¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price19.17¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km3.95 GW[6] derivedConfirmed202502Shown
Site area67.5 acres[1] derivedLikely2026-09-27Shown