Unnamed data center
POWER & GRID
Time-to-power · verification · interconnectionPower reality
Project verification
- Announcedimplied by a later stage
- Land acquiredimplied by a later stage
- Planning / zoningimplied by a later stage
- Permittingimplied by a later stage
- Interconnection application
- Feasibility study
- System impact study
- Facilities study
- Interconnection agreement / service contract
- Financing
- Under constructionimplied by a later stage
- Energizationimplied by a later stage
● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.
Grid path
- →facilityUnnamed data center
- →substationLonestar Dream - Tarbush[1]Proximity onlyUnverifiedNearest mapped substation, 0.27 km away. Proximity does not establish that it serves the site.
- →transmission138 kV line[1]Proximity onlyUnverifiedHighest-voltage line mapped within 2 km (0.33 km away). Not confirmed as the supply path.
- →utilityRio Grande Electric Coop, INC[2]Service territoryLikelyRetail service territory containing the site
- Substation capacity:
- not published
- Required upgrades:
- not yet sourced
- Congestion:
- not yet sourced (no nodal price data)
Dashed boxes are based on proximity only and do not establish which asset serves the site.
Interconnection records
No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.
On-site & dedicated generation
No on-site, behind-the-meter or dedicated generation found in sources.
Location & imagery
Mapped outline- Coordinates
- 31.10347, -103.23855
- County
- Pecos County
No openly licensed ground-level photos matched to this site yet.
Ownership, operation & customers
- 1. Property owner of recordNot identified
- 2. Owner / developerNot identified
- 3. OperatorNot identified
- 4. Tenant / cloudNot identified
- 5. End customer / workloadNot identified
Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.
All parties with evidence
- Utility
Most likely retail provider among 4 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Southwest Texas Elec Coop, INC, Texas-New Mexico Power CO, AEP Texas North Company.
No tenants or end users identified in our sources yet.
Power (all fields)
- Current facility power
- Not yet sourced
- Planned capacity
- Not yet sourced
Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.
Grid & electricity
- ISO / RTO
Location falls inside this ISO/RTO footprint.
- Balancing authority
Control area of the containing utility territory.
- Nearest mapped substation
Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.
- Distance to substation
- Highest-voltage line nearby
Highest-voltage transmission line mapped within 2 km.
- State avg. industrial price
Texas statewide average, July 2026.
- State avg. commercial price
Texas statewide average, July 2026.
- Generation within 50 km
20 EIA-reported plants within 50 km.
- Generation queued in county
50 active generation interconnection requests in Pecos County: Solar 8,210 MW, Gas 5,886 MW, Wind 4,675 MW, Storage 1,945 MW. Queued projects often don't get built.
- Interconnection status
- Not yet sourced
- Contracted / committed power
- Not yet sourced
| Nearby infrastructure | Type | Distance | Voltage / capacity | Source |
|---|---|---|---|---|
| 138 kV line | Transmission line | 0.33 km | 138 kV | [1] |
| Taygete Energy Project LLC · Taygete Energy Project LLC | Power plant (Solar) | 12.7 km | 255 MW | [6] |
| Taygete II Energy Project · West Texas Solar Project II LLC | Power plant (Solar) | 14 km | 204 MW | [6] |
| Flower Valley II · Flower Valley II | Power plant (Batteries) | 15.7 km | 101 MW | [6] |
| Re Roserock · Southern Power Co | Power plant (Solar) | 17.2 km | 158 MW | [6] |
| Barilla Solar · Leeward Asset Management, LLC | Power plant (Solar) | 19.2 km | 30 MW | [6] |
| Rodeo Ranch Energy Storage · Rodeo Ranch Energy Storage, LLC | Power plant (Batteries) | 29.8 km | 300 MW | [6] |
| St. Gall Energy Storage I · St. Gall Energy Storage I | Power plant (Batteries) | 33.7 km | 100 MW | [6] |
| Swoose II · Swoose II | Power plant (Batteries) | 40.4 km | 101 MW | [6] |
| Lonestar Dream - Tarbush | Substation | 0.27 km | — | [1] |
| Unnamed substation | Substation | 1.75 km | 138 kV | [1] |
| Unnamed substation | Substation | 1.8 km | — | [1] |
| Unnamed substation | Substation | 1.9 km | 138 kV | [1] |
| Largest queued generation in this county | Fuel | Queue status | MW | Source |
|---|---|---|---|---|
| Big Canyon WindERCOT 30INR0018 · Longfellow Wind, LLC | Wind | IA signed · proposed 2030-07 | 1.5 GW | [4] |
| The Giant Arc-IIERCOT 30INR0105 · Powering Knowledge, LLC | Gas | In study · proposed 2030-04 | 1.3 GW | [4] |
| The Giant Arc IERCOT 30INR0113 · Powering Knowledge, LLC | Gas | In study · proposed 2030-04 | 1.3 GW | [4] |
| Gravitas I Natural GasERCOT 30INR0084 · S&S Renewables, LLC | Gas | In study · proposed 2030-06 | 1.25 GW | [4] |
| Permian I Natural GasERCOT 31INR0019 · S&S Renewables, LLC | Gas | In study · proposed 2030-06 | 1.25 GW | [4] |
| Permian I SolarERCOT 31INR0018 · S&S Renewables, LLC | Solar | In study · proposed 2030-06 | 1.13 GW | [4] |
Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.
Construction & permitting
- Announced—
- Land acquired—
- Permitting—
- Construction start—
- First operational—
- Expected completion—
Real estate
None sourced yet
None sourced yet
None sourced yet
- Annual property tax
- Not yet sourced
No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.
Size
- Building footprint
Computed from the mapped OSM building outline.
- Floor area
- Not yet sourced
What changed (last 3 years)
Follow this facility (RSS)No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.
Timeline
No dated events sourced yet.
All claims (provenance audit)
12| Field | Value | Source | Confidence | As of | Status |
|---|---|---|---|---|---|
| Status | Operating | [1] derived | Unverified | 2026-09-27 | Shown |
| Utility | Rio Grande Electric Coop, INCterritory 16057: RIO GRANDE ELECTRIC COOP, INC (COOPERATIVE, RIO GRANDE ELECTRIC | [2] derived | Unverified | 2022 | Shown |
| ISO / RTO | ERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC. | [3] derived | Likely | — | Shown |
| Balancing authority | EPE, ERCO | [2] derived | Likely | — | Shown |
| Nearest mapped substation | Lonestar Dream - Tarbushway/1463210151 | [1] derived | Likely | 2026-09-28 | Shown |
| Distance to substation | 0.3 km | [1] derived | Likely | 2026-09-28 | Shown |
| Highest-voltage line nearby | 138 kV | [1] derived | Likely | 2026-09-28 | Shown |
| Generation queued in county | 20.72 GW | [4] derived | Confirmed | 2026-09-01 | Shown |
| State avg. industrial price | 7.07¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| State avg. commercial price | 8.47¢/kWh | [5] | Confirmed | 2026-07 | Shown |
| Generation within 50 km | 1.35 GW | [6] derived | Confirmed | 202502 | Shown |
| Building footprint | 17,500 sq ft | [1] derived | Likely | 2026-09-27 | Shown |