DC
/

Unnamed data center

OperatingUnclassifiedBuildingVenango County, Pennsylvania
10% profile completeness
12 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
700 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Pennsylvania Electric CO · PJM
Substation: Scrubgrass Substation (115 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Scrubgrass Substation (115 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.14 km away. Proximity does not establish that it serves the site.
  3. transmission
    Handsome Lake - Armstrong 345kV[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.85 km away). Not confirmed as the supply path.
  4. utility
    Pennsylvania Electric CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    PJM[3]
    Service territoryLikely
    Balancing authority: PJM
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

No interconnection-queue record is linked to this site. Of the ISOs we ingest, only NYISO publishes large-load requests; PJM, ERCOT, MISO, SPP and CAISO queues list generation only.

On-site & dedicated generation

  • Scrubgrass Reclamation CO. LP. (Coal, 83 MW) is 0.3 km away[6]
    EIA plant within 1.5 km; proximity does not establish that it supplies the facility
    Unknown typeCo-located83 MWUnverified

Location & imagery

Mapped outline
Coordinates
41.27151, -79.81354
County
Venango County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Central Electric Coop, INC - (Pa).

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
PJM[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Balancing authority
PJM[2]Likelyderived

Control area of the containing utility territory.

Nearest mapped substation
Scrubgrass Substation (115 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.1 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
11.04¢/kWh[5]Confirmed

Pennsylvania statewide average, July 2026.

State avg. commercial price
13.86¢/kWh[5]Confirmed

Pennsylvania statewide average, July 2026.

Generation within 50 km
405 MW[6]Confirmedderived

5 EIA-reported plants within 50 km.

Generation queued in county
519 MW[4]Confirmedderived

14 active generation interconnection requests in Venango County: Solar 274 MW, Storage 220 MW, Solar + storage 25 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
115 kV lineTransmission line0.05 km115 kV[1]
Handsome Lake - Armstrong 345kVTransmission line1.85 km345 kV[1]
Scrubgrass Reclamation CO. LP. · Scrubgrass Reclamation CO. LP.Power plant (Coal)0.3 km83 MW[6]
Handsome Lake Energy LLC · Handsome Lake Energy LLCPower plant (Natural Gas)2.2 km268 MW[6]
Wabtec U.S Rail, Grove City Engine Plant · General Electric CoPower plant (Petroleum)26.9 km4 MW[6]
Piney · BP Piney & Deep Creek LLCPower plant (Hydroelectric)33 km33 MW[6]
Allegheny Hydro No 9 · Allegheny Hydro LPPower plant (Hydroelectric)41.4 km18 MW[6]
Scrubgrass SubstationSubstation0.14 km115 kV[1]
Handsome Lake SubstationSubstation2.26 km345 kV[1]
Unnamed substationSubstation2.26 km—[1]
Largest queued generation in this countyFuelQueue statusMWSource
Grandview 115 kVPJM AI1-181StorageIn study · proposed 2027-12140 MW[4]
Eclipse-Piney 115 kV IIPJM AH1-051SolarIn study · proposed 2023-0780 MW[4]
Eclipse-Piney 115 kV IIIPJM AH1-158StorageIn study · proposed 2023-0880 MW[4]
Eclipse-Piney 115 kVPJM AH1-050SolarIn study · proposed 2023-0750 MW[4]
Eclipse #2 34.5 kVPJM AG2-420Solar + storageIn study · proposed 2023-0525 MW[4]
Long BridgePJM AF2-166SolarSuspended · proposed 2026-0820 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
700 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

12
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityPennsylvania Electric COterritory 14711: PENNSYLVANIA ELECTRIC CO (INVESTOR OWNED, FIRSTENERGY CORP)[2] derivedUnverified2022Shown
ISO / RTOPJMPJM INTERCONNECTION, LLC[3] derivedLikely—Shown
Balancing authorityPJM[2] derivedLikely—Shown
Nearest mapped substationScrubgrass Substation (115 kV)way/1050125611[1] derivedLikely2026-09-28Shown
Distance to substation0.1 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county519 MW[4] derivedConfirmed2026-09-27Shown
State avg. industrial price11.04¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price13.86¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km405 MW[6] derivedConfirmed202502Shown
Building footprint700 sq ft[1] derivedLikely2026-09-27Shown