DC
/

Unnamed data center

OperatingUnclassifiedBuildingWard County, Texas
10% profile completeness
11 claims from 6 sources
Current facility power
Not yet sourced
Planned capacity
Not yet sourced
Building footprint
56,800 sq ft[1]
Likelyderived
Buildings (planned)
Not yet sourced
Capital cost / investment
Not yet sourced
First operational
Not yet sourced

POWER & GRID

Time-to-power · verification · interconnection
Time to power
Operating (community-mapped, unverified)
Low confidence
Project verification
Unverified
Evidence is limited to community map.
Current stage
Operational
Furthest stage with documented evidence
Utility · ISO
Texas-New Mexico Power CO · ERCOT
Substation: Unnamed substation (138 kV) (nearest, unverified)

Power reality

Announced
No record
Interconnection request
No record
Contracted / approved
No record
Under construction
No record
Operational
No record
AI evidence brief
Summarizes only the evidence on this page. Answers citing anything else are rejected automatically.

Project verification

Development
  1. Announcedimplied by a later stage
  2. Land acquiredimplied by a later stage
  3. Planning / zoningimplied by a later stage
  4. Permittingimplied by a later stage
Grid interconnection
  1. Interconnection application
  2. Feasibility study
  3. System impact study
  4. Facilities study
  5. Interconnection agreement / service contract
Build & energization
  1. Financing
  2. Under constructionimplied by a later stage
  3. Energizationimplied by a later stage
  4. OperationalSep 27, 2026
    Community map
    • Sep 27, 2026 · Reported status: operating[1]

● documented · ◌ implied by a later stage · ○ no evidence found. Dates are those of the earliest dated evidence, which can be later than when a stage actually began. Evidence classes: Community map.

Grid path

  1. facility
    Unnamed data center
  2. substation
    Unnamed substation (138 kV)[1]
    Proximity onlyUnverified
    Nearest mapped substation, 0.18 km away. Proximity does not establish that it serves the site.
  3. transmission
    345 kV line[1]
    Proximity onlyUnverified
    Highest-voltage line mapped within 2 km (1.21 km away). Not confirmed as the supply path.
  4. utility
    Texas-New Mexico Power CO[2]
    Service territoryLikely
    Retail service territory containing the site
  5. ISO / RTO
    ERCOT[3]
    Service territoryLikely
Substation capacity:
not published
Required upgrades:
not yet sourced
Congestion:
not yet sourced (no nodal price data)

Dashed boxes are based on proximity only and do not establish which asset serves the site.

Interconnection records

QueueRelationshipStageMW req.MW appr.QueuedExpected in servicePOI / TOSource · as of
ERCOT 23INR0094
BRP Pyxis BESS · BRP Pyxis BESS LLC · Storage
Generation at a nearby substation
Unverified
Queue POI “tap 138kV 1009 Yucca - 11197 Sand Tank Pod ” names Sand Lake Switching Station, a substation mapped 1.55 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
System impact study
SS Completed, FIS Started, No IA
206.9——Dec 1, 2028tap 138kV 1009 Yucca - 11197 Sand Tank Pod [4] Sep 1, 2026
ERCOT 24INR0538
FLIFER Solar I · FLIFER LLC · Solar
Generation at a nearby substation
Unverified
Queue POI “Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)” names Sand Lake Switching Station, a substation mapped 1.55 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
System impact study
SS Completed, FIS Started, No IA
84——Apr 15, 2027Tap 138 kV Yucca Drive Switch (bus# 1009) – Sand Tank (bus# 11197)[4] Sep 1, 2026
ERCOT 25INR0008
BasRanch (TEF - Due Diligence) · CPV Basin Ranch, LLC · Gas
Generation at a nearby substation
Unverified
Queue POI “tap 345kV Riverton Switch - Sand Lake Switch” names Sand Lake Switching Station, a substation mapped 1.55 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
Interconnection agreement executed
SS Completed, FIS Completed, IA
1,350——Dec 1, 2028tap 345kV Riverton Switch - Sand Lake Switch[4] Sep 1, 2026
ERCOT 27INR0255
New Minglewood Energy Center · Nova Clean Energy LLC · Storage
Generation at a nearby substation
Unverified
Queue POI “#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV” names Sand Lake Switching Station, a substation mapped 1.55 km from the site (OSM). Sharing a POI does not mean this generation serves the facility.
System impact study
SS Completed, FIS Started, No IA
208.3——Sep 29, 2029#11098 Sand Lake Switch Station (SANDLAKE_5) 345kV[4] Sep 1, 2026

On-site & dedicated generation

No on-site, behind-the-meter or dedicated generation found in sources.

Location & imagery

Mapped outline
Coordinates
31.51388, -103.44867
County
Ward County
Photographs

No openly licensed ground-level photos matched to this site yet.

Ownership, operation & customers

  1. 1. Property owner of record
    Not identified
  2. 2. Owner / developer
    Not identified
  3. 3. Operator
    Not identified
  4. 4. Tenant / cloud
    Not identified
  5. 5. End customer / workload
    Not identified
Power supply

Each link is sourced separately. The property owner of record is often a special-purpose entity; the same company appearing in two roles is shown only when sources say so.

All parties with evidence
Utility

Most likely retail provider among 2 overlapping service territories (largest retail sales; territory polygons are approximate). Also overlapping: Oncor Electric Delivery Company LLC.

No tenants or end users identified in our sources yet.

Power (all fields)

Current facility power
Not yet sourced
Planned capacity
Not yet sourced

Capacity figures are nameplate or contracted; annual consumption is a labeled model estimate, not metered data.

Grid & electricity

ISO / RTO
ERCOT[3]Likelyderived

Location falls inside this ISO/RTO footprint.

Nearest mapped substation
Unnamed substation (138 kV)[1]Likelyderived

Nearest substation mapped in OpenStreetMap; proximity does not establish which substation serves the site.

Distance to substation
0.2 km[1]Likelyderived
Highest-voltage line nearby
345 kV[1]Likelyderived

Highest-voltage transmission line mapped within 2 km.

State avg. industrial price
7.07¢/kWh[5]Confirmed

Texas statewide average, July 2026.

State avg. commercial price
8.47¢/kWh[5]Confirmed

Texas statewide average, July 2026.

Generation within 50 km
1.5 GW[6]Confirmedderived

19 EIA-reported plants within 50 km.

Generation queued in county
3.32 GW[4]Confirmedderived

10 active generation interconnection requests in Ward County: Gas 2,248 MW, Storage 803 MW, Solar 264 MW. Queued projects often don't get built.

Interconnection status
Not yet sourced
Contracted / committed power
Not yet sourced
Nearby infrastructureTypeDistanceVoltage / capacitySource
138 kV line · Texas-New Mexico PowerTransmission line0.19 km138 kV[1]
345 kV lineTransmission line1.21 km345 kV[1]
Swoose II · Swoose IIPower plant (Batteries)10.8 km101 MW[6]
Rodeo Ranch Energy Storage · Rodeo Ranch Energy Storage, LLCPower plant (Batteries)20.5 km300 MW[6]
West of The Pecos Solar · RWE Renewables Americas, LLCPower plant (Solar)28.1 km100 MW[6]
Tx7 Flat Top · Key Capture EnergyPower plant (Batteries)36.1 km10 MW[6]
Flower Valley II · Flower Valley IIPower plant (Batteries)36.2 km101 MW[6]
Permian Basin · Luminant Generation Company LLCPower plant (Natural Gas)46.6 km320 MW[6]
Taygete II Energy Project · West Texas Solar Project II LLCPower plant (Solar)47.5 km204 MW[6]
Taygete Energy Project LLC · Taygete Energy Project LLCPower plant (Solar)49.4 km255 MW[6]
Unnamed substationSubstation0.18 km138 kV[1]
Mi Vida Substation · Texas-New Mexico PowerSubstation0.27 km138 kV[1]
Cochise Substation · Texas-New Mexico PowerSubstation0.32 km138 kV[1]
Sand Lake Switching Station · OncorSubstation1.55 km345 kV[1]
Unnamed substationSubstation1.61 km138 kV[1]
Barstow Northwest Substation · OncorSubstation2.88 km138 kV[1]
Largest queued generation in this countyFuelQueue statusMWSource
BasRanch (TEF - Due Diligence)ERCOT 25INR0008 · CPV Basin Ranch, LLCGasIA signed · proposed 2028-121.35 GW[4]
Vast Sands Power I (TEF -Due Diligence)ERCOT 28INR0105 · Permian Power I LLCGasIA signed · proposed 2028-05440 MW[4]
Vast Sands Power II (TEF-Due Diligence)ERCOT 28INR0109 · Permian Power I LLCGasIA signed · proposed 2028-06440 MW[4]
New Minglewood Energy CenterERCOT 27INR0255 · Nova Clean Energy LLCStorageIn study · proposed 2029-09208 MW[4]
BRP Rhine BESSERCOT 23INR0075 · BRP Rhine BESS LLCStorageIn study · proposed 2028-12207 MW[4]
BRP Pyxis BESSERCOT 23INR0094 · BRP Pyxis BESS LLCStorageIn study · proposed 2028-12207 MW[4]

Utility, ISO and nearby assets are derived from the site's location. Proximity to a substation or line doesn't establish the interconnection; that needs a utility filing or interconnection-queue record. Queue requests are applications, not commitments — most never reach operation.

Construction & permitting

  1. Announced
    —
  2. Land acquired
    —
  3. Permitting
    —
  4. Construction start
    —
  5. First operational
    —
  6. Expected completion
    —

Real estate

Official assessments
Assessor's value for a tax year

None sourced yet

Recorded transactions
Sale prices from recorded deeds

None sourced yet

Model estimates
Our model — not an appraisal

None sourced yet

Annual property tax
Not yet sourced

No county parcel or assessor records linked yet. County records are currently ingested for Loudoun County, VA and Maricopa County, AZ.

Size

Building footprint
56,800 sq ft[1]Likelyderived

Computed from the mapped OSM building outline.

Floor area
Not yet sourced

What changed (last 3 years)

Follow this facility (RSS)

No tracked changes yet. Values are recorded on every data refresh, so changes will appear here over time.

Timeline

No dated events sourced yet.

All claims (provenance audit)

11
FieldValueSourceConfidenceAs ofStatus
StatusOperating[1] derivedUnverified2026-09-27Shown
UtilityTexas-New Mexico Power COterritory 40051: TEXAS-NEW MEXICO POWER CO (INVESTOR OWNED, PNM RESOURCES INC)[2] derivedUnverified2022Shown
ISO / RTOERCOTELECTRIC RELIABILITY COUNCIL OF TEXAS, INC.[3] derivedLikely—Shown
Nearest mapped substationUnnamed substation (138 kV)way/1454568155[1] derivedLikely2026-09-28Shown
Distance to substation0.2 km[1] derivedLikely2026-09-28Shown
Highest-voltage line nearby345 kV[1] derivedLikely2026-09-28Shown
Generation queued in county3.32 GW[4] derivedConfirmed2026-09-01Shown
State avg. industrial price7.07¢/kWh[5] Confirmed2026-07Shown
State avg. commercial price8.47¢/kWh[5] Confirmed2026-07Shown
Generation within 50 km1.5 GW[6] derivedConfirmed202502Shown
Building footprint56,800 sq ft[1] derivedLikely2026-09-27Shown